12 expressways outlined for wider connectivity by 2041 | The Business Standard
Skip to main content
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Get the Paper
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Friday
July 18, 2025

Sign In
Subscribe
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Get the Paper
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
FRIDAY, JULY 18, 2025
12 expressways outlined for wider connectivity by 2041

Infrastructure

Saifuddin Saif
28 November, 2023, 12:00 am
Last modified: 29 November, 2023, 02:40 pm

Related News

  • CA Yunus stresses transparency in finalising July Charter
  • Yongtai Energy’s rejoinder and our reply
  • Fire at Sena Kalyan Bhaban in Motijheel under control
  • Adabor killing: Viral video shows how Sajeeb pulled pistol from bag and shot Ibrahim
  • Banned AL allegedly brought in outsiders before NCP rally attack in Gopalganj

12 expressways outlined for wider connectivity by 2041

The expressways in the draft highway master plan will require Tk1.91 lakh crore investment

Saifuddin Saif
28 November, 2023, 12:00 am
Last modified: 29 November, 2023, 02:40 pm

The Roads and Highways Department (RHD) is working on a highway master plan to interlink the country's road network by 12 expressway routes to establish an extensive internal and cross-border connectivity.

The construction of these expressways will require a total investment of Tk1.91 lakh crore ($17.28 billion), covering a significant expansion of 1,508km of roads with expected implementation by 2041.

Syed Moinul Hasan, RHD's chief engineer, said the master plan aims to integrate all highways in the country into a unified network, which goes beyond the conventional road network.

The Asian Development Bank has drafted the "Highway Master Plan 2041" for the RHD, and a strategy paper for implementation will be formulated once the draft plan is approved in the first half of next year, an official of the department said, requesting anonymity.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

The 12-expressway plan, spanning 10-12 years, necessitates an annual funding of $1.5 billion, the official said, adding that the government will prioritise public-private partnership (PPP) for construction.

The Finance Division and the Economic Relations Division will decide on the financing issues,  the RHD executive added.

Earlier, several initiatives to build expressways on the Dhaka-Chattagram route did not progress due to cost concerns and prospect of a high-speed train line.

Rather, the authorities opted for a traditional road widening project and upgraded the country's most important trade route into a four-lane highway.

The Dhaka-Bhanga expressway is the country's lone access-control expressway that links the capital with the southwestern regions over the Padma Bridge.

Experts say neighbouring countries executed similar highway master plans in the 80s/90s. While constructing expressways may now pose challenges for Bangladesh, it is essential for continual progress and sustainable development, they say.

The proposed expressways

The expressways that have been given importance in the Highway Master Plan 2041 include Dhaka-Chattogram, Dhaka-Chattogram (elevated), Dhaka-Mymensingh, Dhaka-Sylhet, Dhaka Outer Ring Road, Dhaka-Bogura, Mirsharai-Cox's Bazar (via Bangabandhu Tunnel), Mymensingh-Bogura, Gabtoli to Paturia (upgrading the existing one) to Kazirhat, Feni-Barishal, Paturia-Daulatadia, and Jhenaidah-Khushtia-Dasuria.

Dr Mohammad Yunus, research director at the Bangladesh Institute of Development Studies (BIDS), told TBS that to become a developed country, Bangladesh needs to bring infrastructural changes.

"Every country has a master plan for infrastructure development. The highway master plan will be implemented on a priority basis in the long term. As a result, financing will not create much pressure," he said.

He said, in the current economic situation, big projects cannot be taken up now. "We have to wait for the situation to improve. But the master plan should be done now, so that projects can be implemented on priority basis as soon as funds are available."

Mohammad Emdad Ullah Mian, a member of the Physical Infrastructure Division of the Planning Commission, stressed the need for integrated master plans covering road, rail, rural roads, and waterways within the broader spectrum of communication infrastructure. 

"The Planning Commission is actively considering the formulation of an Integrated Communication Masterplan," he added.

Md Shamsul Hoque, a communication expert and professor at Bangladesh University of Engineering and Technology (Buet), welcomed the plan for its departure from traditional highway construction. 

He expressed, "Relying on outdated thinking, we've been expanding roads to 8/10 lanes without security or access control, allowing rickshaws to roam freely. This approach is flawed and has been a costly mistake over time."

Given our limited land and burgeoning population, a strategic shift to elevated ways is essential, he noted. This approach maximises land use without the need for additional spaces, mirroring successful models in Singapore and Hong Kong. 

"It is not just about cost but strategic development, which holds the key to economic growth," the professor added.

Apart from strengthening internal road connectivity, the draft master plan foresees almost 350% growth in the cross-border flow of goods with the development of value chains across borders. 

RHD officials said  the proposed highway master plan will take into consideration multiple highways as slated in the South Asia Subregional Economic Cooperation (Sasec) linking the country's sea and land ports with major border points.

A number of Sasec highways already completed or under-construction include Dhaka-Tangail, Elenga-Hatikumrul-Rangpur, Dhaka-Sylhet, Sylhet–Tamabil and Khushtia-Jhinaidah-Jeshore. 

How it differs from previous plans 

According to RHD officials, a survey was done in 2018 for the construction of an expressway from Dhaka to Chattogram via Laksham at a cost of about Tk98 crore. 

A design of the expressway was also formulated. According to an ADB study, the cost of constructing the 217 km expressway was estimated at $2.5 billion.

Besides, the Bangladesh Bridge Authority in 2016 took the initiative to construct a 225km elevated expressway on the Dhaka-Chittagong route.

However, none of the plans took off due to high costs and  prospect of high-speed trains.

Also, the RHD prepared an expressway plan with the help of Buet experts to build dedicated expressways on North-South and East-West lines.

However, this plan was cancelled in 2021 on financing considerations.

RHD officials said the new master plan is more inclusive than previous ones as it encompasses both internal and cross-bordering connectivities.

Bangladesh / Infograph / Top News

expressway / Connectivity / Bangladesh

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • Around 99% of the cotton used in Bangladesh’s export and domestic garment production is imported. Photo: Collected
    NBR withdraws advance tax on imports of cotton, man-made fibres
  • The fire originated at 10:40pm on the 21th floor of the building. Photo: Collected
    Fire at Sena Kalyan Bhaban in Motijheel under control
  • Chief Adviser Professor Muhammad Yunus presided over a meeting of the National Consensus Commission at the State Guest House Jamuna yesterday (17 July). Photo: UNB
    CA Yunus stresses transparency in finalising July Charter

MOST VIEWED

  • Bangladesh Bank buys $313m more in second dollar auction in three days
    Bangladesh Bank buys $313m more in second dollar auction in three days
  • Representational image. File Photo: Syed Zakir Hossain/TBS
    Malaysia grants Bangladeshi workers multiple-entry visas
  • The Chattogram Custom House building in Chattogram. File Photo: Collected
    Software slowdown disrupts customs operations nationwide
  • NCP leaders are seen getting on an armoured personnel carrier (APC) of the army to leave Gopalganj following attacks on their convoy after the party's rally in the district today (16 july). Photo: Focus Bangla
    NCP leaders leave Gopalganj in army's APC following attack on convoy, clashes between AL, police
  • Renata’s manufacturing standards win european recognition
    Renata’s manufacturing standards win european recognition
  • The supporters of local Awami League and Chhatra League locked in a clash with police following attacks on NCP convoy this afternoon (16 July). Photo: Collected
    Gopalganj under curfew; 4 killed as banned AL, police clash after attack on NCP leaders

Related News

  • CA Yunus stresses transparency in finalising July Charter
  • Yongtai Energy’s rejoinder and our reply
  • Fire at Sena Kalyan Bhaban in Motijheel under control
  • Adabor killing: Viral video shows how Sajeeb pulled pistol from bag and shot Ibrahim
  • Banned AL allegedly brought in outsiders before NCP rally attack in Gopalganj

Features

Illustration: TBS

20 years of war, 7.5m tonnes of bombs, 1.3m dead: How the US razed Vietnam to the ground

5h | The Big Picture
On 17 July 2024, Dhaka University campus became a warzone with police firing tear shells and rubber bullets to control the student movement. File Photo: Rajib Dhar/TBS

17 July 2024: Students oust Chhatra League from campuses, Hasina promises 'justice' after deadly crackdown

12h | Panorama
Abu Sayeed spread his hands as police fired rubber bullets, leading to his tragic death. Photos: Collected

How Abu Sayed’s wings of freedom ignited the fire of July uprising

2d | Panorama
Illustration: TBS

Open source legal advice: How Facebook groups are empowering victims of land disputes

3d | Panorama

More Videos from TBS

Why the conflicting claims over Gopalganj autopsies?

Why the conflicting claims over Gopalganj autopsies?

5h | TBS Stories
Gopalganj violence in international media

Gopalganj violence in international media

6h | TBS World
The Philippines has become a laboratory for China's disinformation propaganda

The Philippines has become a laboratory for China's disinformation propaganda

6h | TBS World
Gopalganj clash: Army urges not to be misled by rumors

Gopalganj clash: Army urges not to be misled by rumors

8h | TBS Today
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net