Uttara-Agargaon Metro Rail work nears completion | The Business Standard
Skip to main content
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Monday
June 09, 2025

Sign In
Subscribe
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
MONDAY, JUNE 09, 2025
Uttara-Agargaon Metro Rail work nears completion

Bangladesh

Jahidul Islam
07 July, 2022, 10:35 pm
Last modified: 07 July, 2022, 10:40 pm

Related News

  • DMTCL urges Metro passengers to wear masks amid rising Covid-19 cases
  • Metro rail resumes operation after Eid break; carrying meat not allowed
  • Metro rail takes Eid break today
  • Metro rail services resume after nearly 2hrs halt due to electrical issue
  • Disruption due to drone, overcrowding cause suffering to Metro passengers

Uttara-Agargaon Metro Rail work nears completion

The construction of the country’s first underground metro rail, known as Mass Rapid Transit Line-1 (MRT-1), will begin next month

Jahidul Islam
07 July, 2022, 10:35 pm
Last modified: 07 July, 2022, 10:40 pm
Representational Image. Photo: Mumit M/TBS
Representational Image. Photo: Mumit M/TBS

The construction of the Dhaka metro rail project's Uttara-to-Agargaon portion is nearing completion and is expected to be open to the public in December.

Almost 94% progress has been made in the construction of the Uttara-Agargaon metro rail route while the overall progress up to Motijheel is 81.19%, said MAN Siddique, managing director (MD) of Dhaka Mass Transit Company Limited (DMTCL).

All work on the Uttara-Agargaon route will be completed in August. Trains are ready and various tests are being conducted for launching operations in this section, he said, adding that the first passenger-less integrated test will be conducted at the beginning of October.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

The official launch of metro rail in December, the month of victory, depends on the success of these tests, said the MD of DMTCL – the company responsible for the implementation and operation of metro rail in the capital.

The construction of a total of 52 infrastructures in the Uttara depot area was completed last month. Tk70.58 crore was saved in land development for the depot, he said, adding that more than a hundred crore Taka will also be saved in infrastructure development.

"All the work of 9 stations from Uttara to Agargaon has been done but the construction of entry-exit has been completed in four stations while the work for the rest five is underway," Siddique said.

There were various challenges in the construction of entry and exit of the stations, including complications with the city corporation over land. All these complications are over now, he said.

On the other hand, the physical work on the country's first underground metro rail, known as Mass Rapid Transit Line-1 (MRT-1), is likely to begin next month, Siddique said.

The MRT Line-1 has two parts – around 19.87km from Hazrat Shahjalal International Airport to Kamalapur with 16.4km underground lines and around 11.37km elevated lines from Natun Bazar to Purbachal.

After completing tender issuance and selection of the depot development firm, the project is now awaiting the approval of the lending agency Japan International Cooperation Agency (Jica), he added.

How much preparation has been taken yet?

MAN Siddique said 10 sets of trains would be needed to operate the metro service from Uttara to Agargaon, adding that 14 sets of trains had already arrived at the depot.

Various functional and performance tests are being conducted separately. An integrated test will be conducted on all types of management before passenger movement, he said.

Siddique also said training the people needed for the operation is underway. Several batches of workers are being trained at home and abroad

"The work of forming MRT police for the overall safety of the metro rail is also in the final stages. It has also been ensured that the metro rail is kept out of load-shedding as an emergency service," he added.

Monument to honour Holey Artisan victims

A monument has been built in honour of the Japanese engineers killed in the 2016 Holey Artisan terrorist attack.

"The monument, built in Japan, has already arrived in the country and is housed at the metro rail's Uttara exhibition centre. It will be placed at the Natun Bazar metro station after completion of construction of MRT Line-1," M A N Siddique said.

He said that after Eid-ul-Azha, the head of JICA and a Japanese minister will come to Bangladesh and inaugurate the monument at the exhibition centre.

BRTC special service for metro passengers

Some 40 buses of Bangladesh Road Transport Corporation (BRTC) will be operated from Uttara and Agargaon stations to help metro passengers reach their destinations, Siddique said, adding that the number of buses will be increased further if needed.

The buses will run on regular BRTC routes from Uttara via Jasimuddin and the airport. BRTC buses will also be operated from Agargaon to Farmgate, he added.

Top News

Uttara-Agargaon Metro Rail / Metro Rail / Dhaka metro rail

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • Chief Adviser Muhammad Yunus leaves for a four-day visit to the United Kingdom from the Dhaka airport on 9 June 2025. Photo: CA Press Wing
    CA Yunus leaves for UK; discussion expected on renewable energy investment, laundered money
  • California Governor Gavin Newsom. File Photo: REUTERS/Fred Greaves
    California Governor Newsom to sue Trump over National Guard deployment amid LA protests
  • File photo of Shafiqul Alam. Photo: Collected
    Positive message for country if CA meets Tarique, but no decision on meeting yet: Shafiqul tells Somoy

MOST VIEWED

  • On left, Abdullah Hil Rakib, former senior vice president (SVP) of BGMEA and additional managing director of Team Group; on right, Captain Md Saifuzzaman (Guddu), a Boeing 787 Dreamliner pilot for Biman Bangladesh Airlines. Photos: Collected
    Ex-BGMEA SVP Abdullah Hil Rakib, Biman 787 pilot Saifuzzaman drown in boating accident in Canada
  • A photo showing the former president on his return to Dhaka today (9 June). 
Source: Collected
    Former president Abdul Hamid returns to Bangladesh from Thailand
  • File Photo: British MP Tulip Siddiq attends a news conference with Richard Ratcliffe, the husband of jailed British-Iranian aid worker Nazanin Zaghari-Ratcliffe, in London, Britain October 11, 2019. Photo: REUTERS/Peter Nicholls/File Photo
    Tulip requests CA Yunus for a meeting over corruption allegations: Guardian
  • Representational image. Photo: Reuters
    Bangladesh reports 3 more Covid-19 cases
  • Muhammad Yunus (L) and Narendra Modi. Photo: Collected
    Modi sends Eid-ul-Adha greetings, Yunus calls for continued bilateral cooperation
  • Photo: Reuters
    Trump says Musk relationship over, warns of 'serious consequences' if he funds Democrats

Related News

  • DMTCL urges Metro passengers to wear masks amid rising Covid-19 cases
  • Metro rail resumes operation after Eid break; carrying meat not allowed
  • Metro rail takes Eid break today
  • Metro rail services resume after nearly 2hrs halt due to electrical issue
  • Disruption due to drone, overcrowding cause suffering to Metro passengers

Features

File photo of Eid holidaymakers returning to the capital from their country homes/Rajib Dhar

Dhaka: The city we never want to return to, but always do

12h | Features
Photo collage shows political posters in Bagerhat. Photos: Jannatul Naym Pieal

From Sheikh Dynasty to sibling rivalry: Bagerhat signals a turning tide in local politics

2d | Bangladesh
Illustration: TBS

Unbearable weight of the white coat: The mental health crisis in our medical colleges

5d | Panorama
(From left) Sadia Haque, Sylvana Quader Sinha and Tasfia Tasbin. Sketch: TBS

Meet the women driving Bangladesh’s startup revolution

5d | Panorama

More Videos from TBS

US and China to meet in London for trade talks

US and China to meet in London for trade talks

58m | TBS World
The forbidden point on Cox's Bazar beach is like a death trap

The forbidden point on Cox's Bazar beach is like a death trap

3h | TBS Today
Israeli forces seize Gaza aid boat carrying Greta Thunberg

Israeli forces seize Gaza aid boat carrying Greta Thunberg

5h | TBS World
Which way will the anti-immigration campaign in Los Angeles turn?

Which way will the anti-immigration campaign in Los Angeles turn?

5h | TBS World
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net