Amid fears of leak, China nuclear plant operator says reactor shut down for ‘maintenance’ | The Business Standard
Skip to main content
  • Latest
  • Epaper
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Sunday
June 22, 2025

Sign In
Subscribe
  • Latest
  • Epaper
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
SUNDAY, JUNE 22, 2025
Amid fears of leak, China nuclear plant operator says reactor shut down for ‘maintenance’

World+Biz

Hindustan Times
30 July, 2021, 07:25 pm
Last modified: 30 July, 2021, 07:34 pm

Related News

  • High-level BNP delegation to leave for China tonight
  • Chinese researchers develop cocktail hydrogel for brain injury therapy 
  • WFP welcomes China's contributions for Rohingyas in Bangladesh
  • Fakhrul to lead BNP delegation to China from 22 June
  • Bangladesh calls for separate South Asia-China platform to tackle climate risks

Amid fears of leak, China nuclear plant operator says reactor shut down for ‘maintenance’

"After lengthy conversations between French and Chinese technical personnel, Taishan Nuclear Power Plant ... decided to shut down Unit 1 for maintenance"

Hindustan Times
30 July, 2021, 07:25 pm
Last modified: 30 July, 2021, 07:34 pm
The Chinese plant operator said it had shut down one reactor after "lengthy" talks with technical staff. Photo/Getty Images via BBC
The Chinese plant operator said it had shut down one reactor after "lengthy" talks with technical staff. Photo/Getty Images via BBC

Weeks after the Chinese government admitted damage to fuel rods at a nuclear power plant, the operator said one of its reactors has been shut down for "maintenance". An increase in radiation inside Unit 1 reactor of the Taishan Nuclear Power Plant had sparked fears of a leak, according to a CNN report.

"After lengthy conversations between French and Chinese technical personnel, Taishan Nuclear Power Plant ... decided to shut down Unit 1 for maintenance," China General Nuclear Power Group (CGN) said in an online statement.

The Taishan Nuclear Power Plant, owned by CGN and Electricite de France (EDF), began commercial operation in December 2018. EDF had warned of an "imminent radiological threat" after damage to fuel rods, reported CNN citing a letter to the US department of energy.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

In the letter, the French power company reportedly accused the Chinese safety authority of raising the acceptable level of radiation outside the power plant, a report denied by the Chinese government. While the ministry of ecology and environment admitted the power plant had five broken fuel rods, it said no radioactivity leaked.

The ministry claimed on its social media account that the radiation was contained by barriers that functioned as planned. "There is no problem of radioactive leakage to the environment," the ministry statement said. It also downplayed the damage saying it was a "common phenomenon" and the damaged fuel rods accounted for "less than 0.01 percent" of the 60,000 fuel rods in the reactor.

After China's admission of minor damage to the plant, a spokesperson for EDF told CNN that it was a "serious situation that is evolving." The spokesperson said that EDF would have shut down the reactor if it was in France due to "the procedures and practices in terms of operating nuclear power plants in France," reported CNN.

 

China / Nuclear Plant / shutdown

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • A rescuer evacuates a dog from an impacted site in Tel Aviv, Israel, after a missile attack from Iran on June 22, 2025. REUTERS/Tomer Appelbaum
    Iran vows to resist US attacks 'with all its might', launches missile strike on Israel
  • Photo: Courtesy
    Bangladesh, China, Pakistan pledge to deepen trilateral cooperation
  • Illustration: Duniya Jahan/TBS Creative
    Tk7.90 lakh crore budget approved, black money whitening provision dropped

MOST VIEWED

  • Dhaka Medical College students demonstrate over five demands in front of the institution's main gate in Dhaka on 21 June 2025. Photo: Courtesy
    Dhaka Medical College closed indefinitely amid protests over accommodation, students ordered to vacate halls
  • US Ambassador Dorothy Shea. Photo: Collected
    US ambassador mistakenly says Israel ‘spreading terror’
  • Infographic: TBS
    Airlines struggle to acquire planes amid global supply shortage
  • Muhammad Fouzul Kabir Khan. Sketch: TBS
    Energy prices fall as import arrears reduced to $700–800m: Adviser
  • A US Air Force B-2 Spirit Stealth Bomber (C) is flanked by 4 US Marine Corps F-35 fighters during a flyover of military aircraft down the Hudson River and New York Harbor past York City, and New Jersey, US 4 July, 2020. REUTERS/Mike Segar/File Photo
    B-2 bombers moving to Guam amid Middle East tensions, US officials say
  • A group of students from United International University (UIU) block the main road in Dhaka’s Bhatara Notun Bazar area protesting the expulsion of 26 final-year honours students on Saturday, 21 June 2025. Photo: Rajib Dhar/TBS
    Students block road at Notun Bazar in protest against expulsion of 26 UIU students

Related News

  • High-level BNP delegation to leave for China tonight
  • Chinese researchers develop cocktail hydrogel for brain injury therapy 
  • WFP welcomes China's contributions for Rohingyas in Bangladesh
  • Fakhrul to lead BNP delegation to China from 22 June
  • Bangladesh calls for separate South Asia-China platform to tackle climate risks

Features

PHOTO: Akif Hamid

Honda City e:HEV debuts in Bangladesh

1h | Wheels
The Jeeps rolled out at the earliest hours of Saturday, 14th June, to drive through Nurjahan Tea Estate and Madhabpur Lake, navigating narrow plantation paths with panoramic views. PHOTO: Saikat Roy

Rain, Hills and the Wilderness: Jeep Bangladesh’s ‘Bunobela’ Run Through Sreemangal

4h | Wheels
Illustration: TBS

Examophobia tearing apart Bangladesh’s education system

17h | Panorama
Airmen look at a GBU-57, or Massive Ordnance Penetrator bomb, at Whiteman Air Force Base in Missouri, US in 2023. Photo: Collected

Is the US preparing for direct military action in Iran?

1d | Panorama

More Videos from TBS

Iran-Israel retaliate after US attack

Iran-Israel retaliate after US attack

38m | TBS World
Targeted fallout: US attack damages these nuclear facilities

Targeted fallout: US attack damages these nuclear facilities

1h | TBS World
Fordow under fire? US-Iran split over nuclear site impact

Fordow under fire? US-Iran split over nuclear site impact

2h | TBS World
Is Israel's main goal to remove Ayatollah Khamenei?

Is Israel's main goal to remove Ayatollah Khamenei?

3h | Others
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net