Tk378cr needed to repair 213km of flood-damaged roads in five Ctg districts: RHD
The RHD has sought Tk45.87 crore for short-term repairs and Tk332.37 crore for long-term rehabilitation from the Ministry of Road Transport and Bridges
The RHD has sought Tk45.87 crore for short-term repairs and Tk332.37 crore for long-term rehabilitation from the Ministry of Road Transport and Bridges