Korean firms to prepare Bay terminal’s master plan, detailed design | The Business Standard
Skip to main content
  • Latest
  • Epaper
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Tuesday
June 24, 2025

Sign In
Subscribe
  • Latest
  • Epaper
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
TUESDAY, JUNE 24, 2025
Korean firms to prepare Bay terminal’s master plan, detailed design

Bangladesh

TBS Report
31 May, 2022, 12:15 pm
Last modified: 31 May, 2022, 10:10 pm

Related News

  • New Mooring Container Terminal to operate under Chattogram Port's own management
  • Anu Muhammad questions CA Yunus’s role in Ctg Port’s container terminal lease push
  • 3-month interim extension sought for Saif Powertec to operate Ctg port terminal
  • Ctg workers party warns against handing over port's NCT operations without international tender
  • Increasing Chattogram Port tariff will severely harm export-oriented industries: Salim Rahman

Korean firms to prepare Bay terminal’s master plan, detailed design

The government set a 2024 deadline for the priority project

TBS Report
31 May, 2022, 12:15 pm
Last modified: 31 May, 2022, 10:10 pm
Photo: Collected
Photo: Collected

The government has appointed consultants for preparing a detailed master plan and engineering design, drawing and estimation for the Bay terminal project under Chattogram Port with a view to completing the construction of the multipurpose terminal by 2024.

Two South Korean companies – Kunhwa Consulting and Engineering Company Limited and DY Engineering – will oversee the project along with developing the master plan at a cost of Tk126.49 crore.

To this end, Rear Admiral Mohammad Shahjahan, chairman of Chattogram Port Authority (CPA), Hwang Kyu Young, president of Kunhwa Consulting, and Kim Dae Jin, managing director of DY Engineering, signed an agreement on behalf of their respective organisations at a city hotel on Tuesday.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

In addition, the government on the same day entered into an agreement with Symbiotic Architects and Associates as a sub-consulting firm.

The CPA chairman said the two major consulting firms would complete a preliminary study in two to three months and a detailed design in six to seven months.

According to sources in the shipping ministry, the new terminal is being constructed in a bid to increase the handling capacity of the country's principal seaport. This will allow ships to dock here round-the-clock. The Chattagram Port Authority will be responsible for the construction and operation of this multipurpose terminal.

The Bay terminal will be built through public-private partnership between the two governments. The cost of the entire project is estimated at $2.1 billion.

The terminal will have multimodal connectivity facilities, including road and rail tracks to the east of the project.

There are no bends in the Bay Terminal Channel and due to proper navigability, it will be possible to berth ships with a maximum carrying capacity of 6,000 TEUs with a 10-12 metre draft. It will be possible to berth 30-35 ships at the same time at the bay terminal.

At present, the Chattogram port jetties can accommodate ships with a maximum draft of 9.5 metres and a length of 190 metres. Besides, the port is navigated just twice a day due to its dependence on high tides.

The bay terminal will initially have three terminals – a 1,225 metre-long container terminal (Container Terminal-1), an 830 metre-long container terminal (Container Terminal-2) and a 1,500 metre-long multipurpose terminal. The total length of the three terminals is 3.55km and there will be a total of 13 jetties.

The size of the operational area of Chattogram port is only 330 acres, while the Bay terminal area will be 2,500 acres - about seven times bigger than the current operational area of the port.

The distance from the bay terminal to the outer anchorage is only one kilometre. The width of the channel is 800-1,200 metres. To protect the bay terminal from hostile weather and large sea waves, a five-kilometre breakwater will be constructed.

The bay terminal is connected to the outer ring road and the 4-lane road. Besides, transportation of goods will be facilitated as there is no city traffic in the project area.

The bay terminal is a priority project of the government. The prime minister has already said that she would like to see it open by 2024, according to State Minister for Shipping Khalid Mahmud Chowdhury, who was present at the signing ceremony.

He said the Chattogram port handles almost all the growing import-export trade of the country. It handled a record 32 lakh TEU containers last year, the highest in a single year, in the wake of the coronavirus pandemic. Its capacity is being continuously increased, keeping in view future demand for international trade.

Besides handling the trade of the country, Chattogram port also handles import and export of neighbouring countries. Through this, the port has become a regional transhipment-transit hub, he added.

The state minister said the government has taken an initiative to implement Matarbari deep seaport to facilitate international trade as well as increase the range of transhipment-transit services.

Besides Matarbari, the Bay Terminal will play an important role in the maritime transport sector of Bangladesh. It will play a helpful role in making the service activities of Chattogram Port more effective, he added.

Top News

Chattogram Port / Bay terminal

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • Iran launches missiles at US bases in Qatar and Iraq in response to strikes, state media reports
    Iran launches missiles at US bases in Qatar and Iraq in response to strikes, state media reports
  • Iran maintains attack was meant to target US, not Qatar
    Iran maintains attack was meant to target US, not Qatar
  • US dollar banknotes are seen in this illustration taken May 4, 2025. Photo: REUTERS/Dado Ruvic/Illustration
    Foreign exchange reserve crosses $21b

MOST VIEWED

  • Representational image. Photo: Collected
    Power returns to parts of Dhaka after 2-hour outage
  • Official seal of the Government of Bangladesh
    Govt raises minimum special allowance to Tk1,500 for civil servants, Tk750 for pensioners in FY26 budget
  • Remittance dollar rate falls amid weak demand, strong export growth
    Remittance dollar rate falls amid weak demand, strong export growth
  • 'Made in Bangladesh' solar panels go to US for the first time
    'Made in Bangladesh' solar panels go to US for the first time
  • Union Bank branch manager uses multiple schemes to embezzle Tk8cr: Internal probe
    Union Bank branch manager uses multiple schemes to embezzle Tk8cr: Internal probe
  • Representational image. Photo: Collected
    Budget FY26: NBR slashes income tax for publicly traded companies, private educational institutions

Related News

  • New Mooring Container Terminal to operate under Chattogram Port's own management
  • Anu Muhammad questions CA Yunus’s role in Ctg Port’s container terminal lease push
  • 3-month interim extension sought for Saif Powertec to operate Ctg port terminal
  • Ctg workers party warns against handing over port's NCT operations without international tender
  • Increasing Chattogram Port tariff will severely harm export-oriented industries: Salim Rahman

Features

The HerWILL mentorship programme - Cohort 01: A rarity in reach and depth

The HerWILL mentorship programme - Cohort 01: A rarity in reach and depth

1d | Features
Graphics: TBS

Who are the Boinggas?

1d | Panorama
PHOTO: Akif Hamid

Honda City e:HEV debuts in Bangladesh

1d | Wheels
The Jeeps rolled out at the earliest hours of Saturday, 14th June, to drive through Nurjahan Tea Estate and Madhabpur Lake, navigating narrow plantation paths with panoramic views. PHOTO: Saikat Roy

Rain, Hills and the Wilderness: Jeep Bangladesh’s ‘Bunobela’ Run Through Sreemangal

1d | Wheels

More Videos from TBS

How the Russian economy is surviving despite Western sanctions

How the Russian economy is surviving despite Western sanctions

1h | Others
Bangladesh and Indian intelligence agencies involved in disappearances: Disappearance Commission

Bangladesh and Indian intelligence agencies involved in disappearances: Disappearance Commission

1h | Podcast
Americans hit by surging electricity prices

Americans hit by surging electricity prices

2h | Others
News of The Day, 23 JUNE 2025

News of The Day, 23 JUNE 2025

2h | TBS News of the day
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net