Payra port to host medium-sized ships from Aug 2022 | The Business Standard
Skip to main content
  • Latest
  • Epaper
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Sunday
June 22, 2025

Sign In
Subscribe
  • Latest
  • Epaper
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
SUNDAY, JUNE 22, 2025
Payra port to host medium-sized ships from Aug 2022

Trade

Sharier Khan
22 May, 2021, 10:00 am
Last modified: 22 May, 2021, 04:33 pm

Related News

  • New Mooring Container Terminal to operate under Chattogram Port's own management
  • Anu Muhammad questions CA Yunus’s role in Ctg Port’s container terminal lease push
  • 3-month interim extension sought for Saif Powertec to operate Ctg port terminal
  • Ctg workers party warns against handing over port's NCT operations without international tender
  • Increasing Chattogram Port tariff will severely harm export-oriented industries: Salim Rahman

Payra port to host medium-sized ships from Aug 2022

The Bay of Bengal deals with the world’s highest volume of sediments carried by Bangladeshi rivers. This poses a challenge for Bangladeshi ports to host large ships

Sharier Khan
22 May, 2021, 10:00 am
Last modified: 22 May, 2021, 04:33 pm
Official boats are docked at the jetty of Payra Port Authority on the Andharmanik River at Kalapara in Patuakhali. Photo: Mumit M/TBS
Official boats are docked at the jetty of Payra Port Authority on the Andharmanik River at Kalapara in Patuakhali. Photo: Mumit M/TBS

Belgian company Jan de Nul will begin a 14-month capital dredging in the Rabnabad channel in the southwestern coastal area at the end of June to allow movement of medium-sized ships at the Payra seaport, official sources said.

The Belgian company will dredge a 65km stretch of the channel, ensuring a draft of 10.5 metres that would allow entry and anchoring of ships having a capacity of carrying 40,000 tonnes (during low tide) to 55,000 tonnes (during high tide).

The Chattogram port, which has a 9.5-metre draft, can handle ships up to 35,000 tonnes. The outer anchorage of Chattogram port in Kutubdia can accommodate 1,00,000-tonne ships.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

Import of goods on larger ships significantly reduces the transport cost if they can be anchored at the port instead of the outer anchorage.

The Tk5,600 crore contract for capital dredging will be signed with Jan de Nul at the end of this month. The government is financing it from its newly formed Bangladesh Infrastructure fund.

After 14 months, the company will continue maintenance dredging in the channel for another two years.

The Payra Port Authority would be fully involved with the dredging work. By the end of Jan de Nul's capital dredging work, the Payra Port Authority is expected to purchase its own dredgers and gradually take over maintenance dredging.

The Bay of Bengal deals with the world's highest volume of sediments carried by Bangladeshi rivers. This poses a challenge for Bangladeshi ports to host large ships.

Jan de Nul has been involved with the Payra port project – first envisioned as a deep-sea port – since 2016. The company was tasked with bringing in an investment of Tk11,000 crore under a public-private partnership which it eventually could not do.

Meanwhile, the government revised its plan and decided to downgrade the deep-sea port project to a seaport project and fund the capital dredging work from its own pocket. This decision has slashed the project cost by 53%.

The Payra deep seaport, another fast-track project, saw spending of only 0.03% from its allocation set for the current fiscal year. Photo: Mumit M/TBS
The Payra deep seaport, another fast-track project, saw spending of only 0.03% from its allocation set for the current fiscal year. Photo: Mumit M/TBS

The Belgian company already has two dredging contracts with the government. It completed the first contract for capital dredging in the same channel to ensure a draft of 6.3 metres to allow movement of coal-carrying ships for the two-unit 1,300 megawatt Payra Coal Power Project. The second contract is for the maintenance of that draft.

"Each month, around 10 ships with a capacity of 20,000 to 30,000 tonnes of coal are coming to the Payra port now," said an official. This coal is being used to generate power in one unit of the large Payra power plant built by China.

As per a directive by the prime minister, the port may be turned into a deep-sea port after it reaches breakeven and develops support infrastructure.

According to State Minister for Shipping Khalid Mahmud Chowdhury, if the port begins operation in full swing next year, it would achieve breakeven by 2035.

The Payra Seaport project, which has 19 components, had an original estimated cost of between $11 billion and $15 billion and was supposed to be completed in three phases.

The Rabnabad channel is situated in the Meghna estuary at Tentulia River in Patuakhali. It is about 270km from the Chattogram Port and 90km from the Mongla Port. This site was chosen as it has available land along the channel with an average height of two metres above sea level. The land does not get submerged during the monsoon and it is well connected by road and river networks.

According to a techno-feasibility study prepared by the British farm HR Wallingford & Consortium, the Payra port will require 7,000 acres of land. Of that, 6,000 acres will be used for port development, 500 acres for coal terminal and the rest for the resettlement of people affected by the construction of the port.

Economy / Top News

Payra Port / payra sea port / Payra plant / Ships / Chattogram Port / Chattogram Port Authority (CPA) / Chattogram Port Authority / Payra port project / Payra Port Authority / Bay of Bengal

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • A B-2 Spirit stealth bomber takes off at Whiteman Air Force Base, Missouri, April 30, 2025. Photo: US Air Force/Staff Sgt. Joshua Hastings/Handout via REUTERS
    Trump says US to go after other Iran targets if peace doesn't come
  • Photo: Courtesy
    Bangladesh, China, Pakistan pledge to deepen trilateral cooperation
  • Infograph: TBS
    Govt moves to curb family control, protect policyholders in insurance sector

MOST VIEWED

  • Dhaka Medical College students demonstrate over five demands in front of the institution's main gate in Dhaka on 21 June 2025. Photo: Courtesy
    Dhaka Medical College closed indefinitely amid protests over accommodation, students ordered to vacate halls
  • US Ambassador Dorothy Shea. Photo: Collected
    US ambassador mistakenly says Israel ‘spreading terror’
  • Infographic: TBS
    Airlines struggle to acquire planes amid global supply shortage
  • Muhammad Fouzul Kabir Khan. Sketch: TBS
    Energy prices fall as import arrears reduced to $700–800m: Adviser
  • A US Air Force B-2 Spirit Stealth Bomber (C) is flanked by 4 US Marine Corps F-35 fighters during a flyover of military aircraft down the Hudson River and New York Harbor past York City, and New Jersey, US 4 July, 2020. REUTERS/Mike Segar/File Photo
    B-2 bombers moving to Guam amid Middle East tensions, US officials say
  • A group of students from United International University (UIU) block the main road in Dhaka’s Bhatara Notun Bazar area protesting the expulsion of 26 final-year honours students on Saturday, 21 June 2025. Photo: Rajib Dhar/TBS
    Students block road at Notun Bazar in protest against expulsion of 26 UIU students

Related News

  • New Mooring Container Terminal to operate under Chattogram Port's own management
  • Anu Muhammad questions CA Yunus’s role in Ctg Port’s container terminal lease push
  • 3-month interim extension sought for Saif Powertec to operate Ctg port terminal
  • Ctg workers party warns against handing over port's NCT operations without international tender
  • Increasing Chattogram Port tariff will severely harm export-oriented industries: Salim Rahman

Features

Illustration: TBS

Examophobia tearing apart Bangladesh’s education system

11h | Panorama
Airmen look at a GBU-57, or Massive Ordnance Penetrator bomb, at Whiteman Air Force Base in Missouri, US in 2023. Photo: Collected

Is the US preparing for direct military action in Iran?

22h | Panorama
Monsoon in Bandarban’s hilly hiking trails means endless adventure — something hundreds of Bangladeshi hikers eagerly await each year. But the risks are sometimes not worth the reward. Photo: Collected

Tragedy on the trail: The deadly cost of unregulated adventure tourism in Bangladesh’s hills

1d | Panorama
BUET Professor Md Ehsan stands beside his newly designed autorickshaw—just 3.2 metres long and 1.5 metres wide—built for two passengers to ensure greater stability and prevent tipping. With a safety-focused top speed of 30 km/h, the vehicle can be produced at an estimated cost of Tk1.5 lakh. Photo: Junayet Rashel

Buet’s smart fix for Dhaka's autorickshaws

2d | Features

More Videos from TBS

US attacks 3 Iranian nuclear facilities, including Fordow

US attacks 3 Iranian nuclear facilities, including Fordow

20m | TBS World
The strategy that keeps Iran alive despite US sanctions

The strategy that keeps Iran alive despite US sanctions

10h | Others
Pekua Rupai Canal nearing death due to encroachment and pollution

Pekua Rupai Canal nearing death due to encroachment and pollution

1h | TBS Stories
What Badiul Alam Majumder said about the election of representatives to the upper house

What Badiul Alam Majumder said about the election of representatives to the upper house

11h | TBS Today
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net