Govt revives cancelled Matarbari 1,200MW coal-fired power plant
Matarbari 1,200MW Power Plant (Phase-1) was built at a cost of Tk57,000 crore and in contrast proposed Matarbari 1,200MW phase-2 will cost less than half of the Phase-1 which is Tk25,114.72 crore