Buckled track, fire cause severe railway disruption | The Business Standard
Skip to main content
  • Latest
  • Epaper
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Friday
June 20, 2025

Sign In
Subscribe
  • Latest
  • Epaper
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
FRIDAY, JUNE 20, 2025
Buckled track, fire cause severe railway disruption

Transport

Azizul Shonchay & Foisal Ahmed
29 April, 2023, 10:20 pm
Last modified: 29 April, 2023, 10:29 pm

Related News

  • Inter-city train services resume after 28 days
  • Alps rockslide halts train services between France and Italy
  • Bangladesh-India Mitali Express services to be suspended for Eid-ul-Adha
  • Steward services elusive on trains of Eastern Zone
  • Trains to stop at ‘D’ class Brahmanbaria station from Tuesday

Buckled track, fire cause severe railway disruption

Experts have expressed skepticism that pouring water or using water hyacinth on the tracks will have any positive impact in overcoming the bending problem.

Azizul Shonchay & Foisal Ahmed
29 April, 2023, 10:20 pm
Last modified: 29 April, 2023, 10:29 pm
Photo: TBS
Photo: TBS

Highlights

  • Rail tracks got bent in Brahmanbaria for the second time in three days
  • Train movement with Dhaka-Ctg-Sylhet to Dhaka was suspended for several hours
  • Fire at a warehouse snapped rail connectivity from Chattogram to Dhaka and Sylhet
  • On Thursday, 7 bogies of a container train veered off the tracks in Brahmanbaria due to buckled track
  • Excessive heat is behind buckled railway tracks, said officials
  • Railway workers using cold water and water hyacinth to cool down the tracks

Railway communication in the country was severely disrupted on Saturday, causing suffering to thousands of passengers, as rail tracks got bent for the second time in three days in Brahmanbaria and a fire broke out at a tire warehouse close to railway tracks in the Dewanhat area of Chattogram.

The major disruption occurred at a time when many people are returning to the city areas, including the capital Dhaka, after celebrating the Eid vacation in their village homes.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

Railway movement on the upline route from Chattogram and Sylhet to Dhaka was suspended as the rail tracks got bent in Brahmanbaria due to excessive heat.

Officials said the rail tracks got bent at the Dariyapur and Haran areas of Brahmanbaria Sadar upazila around 11 am, snapping the rail communication. Train movement in the route resumed at around 8 pm.

On the other hand, a fire broke out at around 1 pm a tire warehouse in the Dewanhat area of Chattogram and was brought under control at 2.20 pm.

Twelve firefighting units worked to douse the blaze that prompted the railway authorities to suspend railway connectivity from Chattogram to Dhaka, Sylhet and the rest of the country as the fire spot was very close to the railway tracks.

Earlier, on Thursday afternoon, seven bogies of a container train veered off the tracks in the Dariyapur area while heading towards Dhaka from Chattogram due to severe heat around 12:50 pm. The accident resulted in about 500 metres of the railway line being damaged and the sleeper being broken.

The rail tracks became normal for movement around 31 hours after it was fixed at 8 pm on Friday.

Photo: TBS
Photo: TBS

The Bangladesh Railway has yet to find a permanent solution to the track bending problem as they are currently resorting to pouring cold water onto the tracks in order to cool them down and prevent further bending.

However, experts have expressed skepticism that pouring water or using water hyacinth on the tracks will have any positive impact in overcoming the problem.

Instead, they recommended several actions, such as adopting automation for track maintenance, applying white paint to the tracks, and using concrete slabs instead of stone.

The railway authorities have cited excessive heat as the cause of the track bending. They said rail tracks are at risk of bending when the temperature rises above 45 degrees Celsius. On Saturday, in Dariyapur, the railway line bent due to a temperature of approximately 50 degrees Celsius.

Md Jahangir Hossain, general manager of the east zone of Bangladesh Railway, said that there is no permanent solution to the problem of railway tracks bending caused by excessive heat.

"It has been a recurring issue for years. When temperatures reach around 40 degrees Celsius or higher, the tracks become susceptible to bending," he said.

He explained that small gaps are built into railway tracks to account for heat expansion or rail-wheel friction, but overheating causes the tracks to expand beyond their designed capacity, resulting in bending.

Md Jahangir added that the tracks will naturally return to their normal shape once temperatures drop. However, in the meantime, they are cooled down by pouring cold water and using water hyacinth.

Mehdi Hasan Ahmed Tarek, assistant executive engineer of Akhaura Railway, said that they have increased monitoring on both the down and up lines to avoid any accidents.

Railway officials said that they will replace the wooden sleepers with concrete sleepers on the railway line when the temperature drops.

Md Rafiqul, station master at Brahmanbaria Railway Station, said that wooden sleepers have a lower load bearing capacity, which contributes to the track bending. The situation will return to normal once the temperature drops and the concrete sleepers are installed.

Experts say to permanently overcome the issue of track bending the railway authorities need to change the entire technology and adopt automation for line maintenance.

Mahiat Hasna, transport coordinator for the Global Road Safety Programme, told The Business Standard, "I do not believe that pouring water or using water hyacinth on the tracks will have any positive impact. These measures may be a waste of time, as the temperature typically drops on its own after dusk."

She alleged that there is a lack of proper maintenance of the railway tracks and added that the manual maintenance of the lines is time-consuming and may not be accurately fixed. 

Mahiat added that since heatwaves may persist in the coming years, immediate action needs to be taken to prepare for the challenges ahead.

However, she acknowledged that implementing long-term solutions would require time and a substantial budget. In the meantime, she suggested that authorities could consider temporary solutions that have proven effective in other countries facing similar challenges. 

"For instance, railways could apply white paint on the track to decrease the temperature by 5-8 degrees Celsius. Additionally, many countries are now using concrete slabs instead of stone for the track, and they have seen positive results. Concrete slabs can prevent track bending, but the joints must be monitored and the clips need to be changed after a certain period."

Mamunnul Islam, joint director general (engineering) of Bangladesh Railway, declined to comment on the matter citing physical sickness. Meanwhile, Md Abu Jafor Mia, chief engineer (east) of Bangladesh Railway, did not respond despite repeated attempts to contact him.

Photo: TBS
Photo: TBS

Meanwhile, passengers and members of civil society have called for increased monitoring of railway lines to ensure safe travel and prevent major accidents.

Piyush Kanti Acharya, president of the District Citizen Forum in Brahmanbaria, questioned why the railway line bent in a temperature of 34 degrees Celsius today, while it did not bend at a temperature of 39 degrees Celsius recently. He called for an investigation and warned that if this problem persists, it could lead to a major train accident.

The railway authorities have issued instructions to reduce the speed of trains on the down line to prevent accidents.

As a result, trains will cross the site of the recent accidents at a maximum speed of 10 km per hour, while the maximum speed limit for other areas will be 20 km per hour.

Earlier, on 29 August last year, train movement was disrupted due to excessive heat in the Chotaharan area of Brahmanbaria Sadar upazila.

The railway tracks in Bangladesh span around 3,000 kilometres in length.

Bangladesh / Top News

Railway track / train services

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • Infographic: TBS
    $3.6b budget support expected by month-end
  • A building at the campus of the Weizmann Institute of Science remains damaged following an Iranian missile strike on Sunday, in Rehovot, Israel June 19, 2025. REUTERS
    Israel-Iran air war enters second week as Europe pushes diplomacy
  • BUET Professor Md Ehsan stands beside his newly designed autorickshaw—just 3.2 metres long and 1.5 metres wide—built for two passengers to ensure greater stability and prevent tipping. With a safety-focused top speed of 30 km/h, the vehicle can be produced at an estimated cost of Tk1.5 lakh. Photo: Junayet Rashel
    Buet’s smart fix for Dhaka's autorickshaws

MOST VIEWED

  • BAT Bangladesh to shut Mohakhali factory, relocate HQ after lease rejection
    BAT Bangladesh to shut Mohakhali factory, relocate HQ after lease rejection
  • Mashrur Arefin appointed Chairman of the Association of Bankers Bangladesh
    Mashrur Arefin appointed Chairman of the Association of Bankers Bangladesh
  • Illustration: Ashrafun Naher Ananna/TBS Creative
    From 18m to 590m francs: Deposits from Bangladeshis fly high in Swiss banks in 2024
  • Students attend their graduation ceremony. REUTERS/Brian Snyder/File Photo
    US resumes student visas but orders enhanced social media vetting
  • Emergency workers at Soroka Medical Center after an Iranian missile strike, Israel June 19, 2025. Photo: Reuters
    Khamenei 'cannot continue to exist', Israeli defence minister says after hospital strike
  • Representational image. Photo: Bloomberg
    NBR’s policy reversal jolts oceangoing shipping, $3.5b investment, $1b yearly freight at risk

Related News

  • Inter-city train services resume after 28 days
  • Alps rockslide halts train services between France and Italy
  • Bangladesh-India Mitali Express services to be suspended for Eid-ul-Adha
  • Steward services elusive on trains of Eastern Zone
  • Trains to stop at ‘D’ class Brahmanbaria station from Tuesday

Features

BUET Professor Md Ehsan stands beside his newly designed autorickshaw—just 3.2 metres long and 1.5 metres wide—built for two passengers to ensure greater stability and prevent tipping. With a safety-focused top speed of 30 km/h, the vehicle can be produced at an estimated cost of Tk1.5 lakh. Photo: Junayet Rashel

Buet’s smart fix for Dhaka's autorickshaws

1h | Features
Evacuation of Bangladeshis: Where do they go next from conflict-ridden Iran?

Evacuation of Bangladeshis: Where do they go next from conflict-ridden Iran?

1d | Panorama
The Kallyanpur Canal is burdened with more than 600,000 kilograms of waste every month. Photo: Courtesy

Kallyanpur canal project shows how to combat plastic pollution in Dhaka

2d | Panorama
The GLS600 overall has a curvaceous nature, with seamless blends across every panel. PHOTO: Arfin Kazi

Mercedes Maybach GLS600: Definitive Luxury

3d | Wheels

More Videos from TBS

Bribery exposed: BBS report reveals year’s dark data

Bribery exposed: BBS report reveals year’s dark data

12h | TBS Today
Is the story of nuclear weapons just to justify military operations?

Is the story of nuclear weapons just to justify military operations?

13h | TBS World
What are the political parties saying about the presidential election and power?

What are the political parties saying about the presidential election and power?

13h | TBS Today
Pakistan Army Chief urges US not to get involved in Iran-Israel war

Pakistan Army Chief urges US not to get involved in Iran-Israel war

15h | Others
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net