Hatirjheel's comfort lost in prolonged utility work | The Business Standard
Skip to main content
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Sunday
July 06, 2025

Sign In
Subscribe
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
SUNDAY, JULY 06, 2025
Hatirjheel's comfort lost in prolonged utility work

Bangladesh

Md Jahidul Islam
24 June, 2023, 01:10 pm
Last modified: 24 June, 2023, 01:20 pm

Related News

  • Man gets 10 years' jail for attempted child rape in Hatirjheel
  • Blackened waters and foul stench: Why can't Rajuk control Hatirjheel pollution?
  • Elevated Expressway: Activists demand probe commission over law violations, mismanagement, environmental destruction
  • Mosquito swarms ‘denser than air’ hit Hatirjheel, nearby areas
  • 'Beautiful Bangladesh Run' breathes life into Hatirjheel

Hatirjheel's comfort lost in prolonged utility work

A signboard in the area advises people to avoid the road but does not mention when the work will end

Md Jahidul Islam
24 June, 2023, 01:10 pm
Last modified: 24 June, 2023, 01:20 pm
Traffic chaos continues to bug commuters as road digging work on the Moghbazar-Rampura section of Hatirjheel Link Road lingers for months. Photo: Md Jahidul Islam
Traffic chaos continues to bug commuters as road digging work on the Moghbazar-Rampura section of Hatirjheel Link Road lingers for months. Photo: Md Jahidul Islam

Lingering digging on the Moghbazar to Rampura section of Hatirjheel Link Road – once considered a peaceful oasis in chaotic Dhaka traffic – has now become a nightmare for the commuters. 

Three months have passed since digging started on 12 March despite the project having a two-month tenure.

There is no end to the work in sight as the messy civic work on the service lane of the one-way road continues at a snail's pace. 

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

The Dhaka Power Distribution Company (DPDC) is installing 132 KV underground cable by digging a utility duct along about 3km of the road on the southern side of Hatirjheel Lake.

Rajuk Chief Engineer (Project and Design) ASM Raihanul Ferdous told The Business Standard that the work has been delayed due to the Ramadan holidays. Besides, it took time to get permission from the police.

"We have urged the DPDC to complete its work quickly so that the road can be repaired without any more delay," he mentioned.

Photo: Md Jahidul Islam
Photo: Md Jahidul Islam

State of the road

During a visit to the area on 21 June, the service lane from Hatirjheel's Mohanagar Project gate to Rampura was found dug up to lay electric cable pipe.

Even though the power line installation has been completed from the Moghbazar section to the Mohanagar Project area, the road has not been repaired.

As a result, vehicles are forced to use one lane causing unrelenting traffic jams, especially during office-commuting times in the morning and evening.

On top of that, soil, brick and sand were seen piled on the footpaths, causing inconvenience to pedestrians.

A signboard in the area advises people to avoid the road but does not mention when the work will end.

Sajib Ahmed, a motorcyclist who regularly uses the road, told TBS that it takes more than one and half hours to go from Rampura to Gulshan on this road during office hours in the morning. 

Photo: Md Jahidul Islam
Photo: Md Jahidul Islam

"The entire road is jammed. When it rains, the road in Moghbazar becomes difficult to travel due to the sand and dirt left behind," he said.

Hasnahena Begum, a resident of Rampura, told TBS that it is not possible to walk even on the sidewalk due to the mud. 

"The area has become suffocating due to dust," she said.

Unplanned digging in Hatirjheel

Architect and urban expert Iqbal Habib who worked as a consultant since the beginning of the Hatirjheel project told TBS that the utility work will make the lakefront road more beautiful as it will remove electricity poles and replace them with underground power lines.

However, he acknowledged that if the utility duct had been installed at the beginning of the project, there would have been no need to dig a new one.

"The government was under economic stress at that time," he said.

Moreover, the size and duration of the project would have been much larger if utility ducts had been laid for the DPDC's high-voltage cables, he said. 

He also said that coordination with other service providers could have been done before taking up this project. 

Photo: Md Jahidul Islam
Photo: Md Jahidul Islam

Chief Engineer Raihanul Ferdous told TBS that since there are no houses in the Hatirjheel area, the duct is not so important for other government agencies. 

"There is no possibility of gas or water lines going under the road so it is not included in the plan," he added.

Hatirjheel project

Since the Hatirjheel project was taken up, the size of the project has been increased step by step for better civic amenities and making it future-proof.

However, a utility duct was in the plan for the Tk2,000 crore Hatirjheel project. 

This ongoing digging for underground power cables also doesn't have any other future utility projects. As a result, this road may be dug again for the development of water or gas distribution. 

The government approved the Hatirjheel project in October 2007. Time and cost gradually increased to Tk2,236 crore.

Under the project, 302 acres of reservoir and land have been developed, including an 8.8km expressway road, 9.8km service road, four bridges, four overpasses, three viaducts and 2 u-loops.

The Hatirjheel project was awarded the "2020 Great Places Award" in the "place planning" category by the US-based Environmental Design Research Association.

 

Top News

Hatirjheel / Road repair / Hatirjheel Link Road

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • Ships and shipping containers are pictured at the port of Long Beach in Long Beach, California, US, 30 January 2019. Photo: REUTERS
    Bangladesh may offer zero-duty on US goods to get reciprocal tariff relief
  • Expatriates and students rallied across the globe — from Malaysia to the USA, UK, Middle East, and Europe — in protest against the Hasina government in July 2024. Photo: Anonno Afroz
    How expatriates powered the July uprising from afar
  • BNP Standing Committee member Salahuddin Ahmed spoke at a rally organised by the Keraniganj Upazila South BNP today (5 July). Photo: Collected
    AL allies of 16 years now back proportional elections: Salahuddin

MOST VIEWED

  • Ships and shipping containers are pictured at the port of Long Beach in Long Beach, California, US, 30 January 2019. Photo: REUTERS
    Bangladesh expects US tariff relief after Trump announces cuts to Vietnam
  • Customs bureaucracy: Luxury cars rot at Ctg port
    Customs bureaucracy: Luxury cars rot at Ctg port
  • The release was jointly carried out by the Forest Department and the Chattogram Zoo authorities as part of an ongoing initiative to conserve wildlife and maintain ecological balance. Photo: Collected
    33 Python hatchlings born in Ctg zoo released into Hazarikhil sanctuary
  • File photo of a new NBR office in Agargaon, Dhaka. Photo: UNB
    NBR launches 'a-Chalan' for instant online tax payments
  • Officials from various NBR offices in the capital gather at the NBR headquarters in Agargaon, Dhaka on 24 June. File Photo: TBS
    Govt may ease punitive actions against NBR officials
  • Infograph: TBS
    How BB’s floating rate regime calms forex market

Related News

  • Man gets 10 years' jail for attempted child rape in Hatirjheel
  • Blackened waters and foul stench: Why can't Rajuk control Hatirjheel pollution?
  • Elevated Expressway: Activists demand probe commission over law violations, mismanagement, environmental destruction
  • Mosquito swarms ‘denser than air’ hit Hatirjheel, nearby areas
  • 'Beautiful Bangladesh Run' breathes life into Hatirjheel

Features

Students of different institutions protest demanding the reinstatement of the 2018 circular cancelling quotas in recruitment in government jobs. Photo: Mehedi Hasan

5 July 2024: Students announce class boycott amid growing protests

1d | Panorama
Contrary to long-held assumptions, Gen Z isn’t politically clueless — they understand both local and global politics well. Photo: TBS

A misreading of Gen Z’s ‘political disconnect’ set the stage for Hasina’s ouster

1d | Panorama
Graphics: TBS

How courier failures are undermining Bangladesh’s online perishables trade

1d | Panorama
The July Uprising saw people from all walks of life find themselves redrawing their relationship with politics. Photo: Mehedi Hasan

Red July: The political awakening of our urban middle class

1d | Panorama

More Videos from TBS

Trump says he is about to raise tariffs as high as 70% on some countries

Trump says he is about to raise tariffs as high as 70% on some countries

3h | TBS World
Will political disputes delay the elections?

Will political disputes delay the elections?

3h | TBS Stories
Initiative to break the deadlock created by the US

Initiative to break the deadlock created by the US

4h | TBS World
Beijing openly sides with Moscow for the first time

Beijing openly sides with Moscow for the first time

6h | TBS World
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net