Up to $1.71b required annually till 2041 for 40% renewable capacity: Study | The Business Standard
Skip to main content
  • Latest
  • Epaper
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Sunday
June 22, 2025

Sign In
Subscribe
  • Latest
  • Epaper
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
SUNDAY, JUNE 22, 2025
Up to $1.71b required annually till 2041 for 40% renewable capacity: Study

Energy

TBS Report
05 April, 2023, 11:00 pm
Last modified: 05 April, 2023, 11:28 pm

Related News

  • Budgeting for Bangladesh’s energy transition
  • Govt plans renewable energy, eco-tourism on unused tea estate land
  • Renewable energy pitch will not yield fruit until institutional change
  • Govt's 5,238MW grid-tied solar push faces tepid response from investors
  • EIB to provide €350 million loan for Bangladesh's renewable energy projects

Up to $1.71b required annually till 2041 for 40% renewable capacity: Study

TBS Report
05 April, 2023, 11:00 pm
Last modified: 05 April, 2023, 11:28 pm
Infographic: TBS
Infographic: TBS

Bangladesh would require an annual investment of $1.53 billion to $1.71 billion from 2024 through 2041 to achieve its ambitious 40% renewable energy target in total generation capacity, estimates a new report of the Institute for Energy Economics and Financial Analysis (IEEFA).

The report claimed that the estimated investment is less than the power sector's subsidy burden in the fiscal 2021-22.

It adds that a faster transition to renewable energy would free up financial resources that otherwise end up as subsidy payments.

But the report did not describe how much investment is pouring into renewable energy in the existing fossil fuel-dominated generation regime.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

Meanwhile, another report released last month by Change Initiative, a renewable energy research and advocacy firm, claimed that from 2016 to 2022, renewable energy received around $6.71 billion in investment from different funding sources.

The Change Initiative also estimated the country would require around $26.5 billion in investment over the next 20 years to achieve its renewable energy target.

Meanwhile, the IEEFA report finds that high prices of fossil fuels and the resultant increase in power generation costs have led to a surge in the subsidy required by the country's power sector.

For FY2021-22, the subsidy reached Tk29,700 crore, nearly 152% higher than the previous fiscal year.

Therefore, it suggests a path for the country to transition its electricity sector away from dependence on expensive imported fossil fuels and ease its growing subsidy burden.

"Bangladesh's electricity generation model appears unsustainable without a clear transition pathway. Therefore, policymakers should raise their renewable energy targets and reflect the same in the upcoming Integrated Energy and Power Master Plan (IEPMP)," says the report's author Shafiqul Alam, Energy Finance Analyst, IEEFA.

"The government should also translate the renewable energy policy target into a year-wise action plan backed by a monitoring mechanism to track progress," he added.

The report finds that accelerating the transition of the electricity sector to renewable energy can free up financial resources and enhance the country's energy security.

"Our analysis shows that the existing power system can immediately incorporate 1,700 MW to 3,400 MW of solar during the day and, subject to the feasibility of location and availability of sufficient wind speed, 2,500 MW to 4,000 MW of wind power at night to reduce the use of costly furnace oil-based power generation," said Alam.

The report calls on the government to bring in policy changes to promote the adoption of renewable energy. For example, the report suggests the government lift the current cap on rooftop solar installation capacity by up to 70% of the sanctioned load of industrial and commercial buildings.

Similarly, it also recommends waiving applicable duties on fibre-reinforced polymer (FRP) walkways, imported inverters, mounting structures, and direct current (DC) cable, ranging from 15.25% to 58.6%, for rooftop solar projects.

Bangladesh had set a target to generate 10% of its total power generation from renewable sources by 2020, which was later extended to 2030.

At present, the country's renewable energy generation capacity is only 3.61% of the total 26,700 MW generation capacity that includes captive generation, imported power, and off-grid solar power.

However, the country now has another ambitious target: to generate 40% of its energy from renewable sources by 2041, when its power generation capacity will be 60,000 MW.

Economy / Top News

Institute for Energy Economics and Financial Analysis (IEEFA) / Renewable Energy

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • A rescuer evacuates a dog from an impacted site in Tel Aviv, Israel, after a missile attack from Iran on June 22, 2025. REUTERS/Tomer Appelbaum
    US says Iran nuclear sites 'severely damaged' after strikes
  • Bangladesh’s foreign debt repayments rise 23.4% in 11 months, near $4 billion
    Bangladesh’s foreign debt repayments rise 23.4% in 11 months, near $4 billion
  • Representational image: WHO
    Five Covid-19 deaths reported in 24 hours, 36 new cases detected

MOST VIEWED

  • Dhaka Medical College students demonstrate over five demands in front of the institution's main gate in Dhaka on 21 June 2025. Photo: Courtesy
    Dhaka Medical College closed indefinitely amid protests over accommodation, students ordered to vacate halls
  • US Ambassador Dorothy Shea. Photo: Collected
    US ambassador mistakenly says Israel ‘spreading terror’
  • Infographic: TBS
    Airlines struggle to acquire planes amid global supply shortage
  • Muhammad Fouzul Kabir Khan. Sketch: TBS
    Energy prices fall as import arrears reduced to $700–800m: Adviser
  • A US Air Force B-2 Spirit Stealth Bomber (C) is flanked by 4 US Marine Corps F-35 fighters during a flyover of military aircraft down the Hudson River and New York Harbor past York City, and New Jersey, US 4 July, 2020. REUTERS/Mike Segar/File Photo
    B-2 bombers moving to Guam amid Middle East tensions, US officials say
  • A group of students from United International University (UIU) block the main road in Dhaka’s Bhatara Notun Bazar area protesting the expulsion of 26 final-year honours students on Saturday, 21 June 2025. Photo: Rajib Dhar/TBS
    Students block road at Notun Bazar in protest against expulsion of 26 UIU students

Related News

  • Budgeting for Bangladesh’s energy transition
  • Govt plans renewable energy, eco-tourism on unused tea estate land
  • Renewable energy pitch will not yield fruit until institutional change
  • Govt's 5,238MW grid-tied solar push faces tepid response from investors
  • EIB to provide €350 million loan for Bangladesh's renewable energy projects

Features

PHOTO: Akif Hamid

Honda City e:HEV debuts in Bangladesh

5h | Wheels
The Jeeps rolled out at the earliest hours of Saturday, 14th June, to drive through Nurjahan Tea Estate and Madhabpur Lake, navigating narrow plantation paths with panoramic views. PHOTO: Saikat Roy

Rain, Hills and the Wilderness: Jeep Bangladesh’s ‘Bunobela’ Run Through Sreemangal

8h | Wheels
Illustration: TBS

Examophobia tearing apart Bangladesh’s education system

21h | Panorama
Airmen look at a GBU-57, or Massive Ordnance Penetrator bomb, at Whiteman Air Force Base in Missouri, US in 2023. Photo: Collected

Is the US preparing for direct military action in Iran?

1d | Panorama

More Videos from TBS

Govt moves to curb family control, protect policyholders in insurance sector

Govt moves to curb family control, protect policyholders in insurance sector

2h | TBS Insight
Politicisation of trade bodies: What new BGMEA president says

Politicisation of trade bodies: What new BGMEA president says

1h | Corporate Talks
Election Irregularities: BNP Files Complaint Against Hasina, Former CECs

Election Irregularities: BNP Files Complaint Against Hasina, Former CECs

3h | TBS Today
Iran-Israel retaliate after US attack

Iran-Israel retaliate after US attack

4h | TBS World
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net