India eases sulphur emission rules for coal power plants, reversing decade-old mandate | The Business Standard
Skip to main content
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Monday
July 14, 2025

Sign In
Subscribe
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
MONDAY, JULY 14, 2025
India eases sulphur emission rules for coal power plants, reversing decade-old mandate

South Asia

Reuters
13 July, 2025, 01:00 pm
Last modified: 13 July, 2025, 01:34 pm

Related News

  • Musk's Tesla marks formal India entry with Mumbai launch event
  • Inside the cockpit: How Air India's Boeing Dreamliner flight ended in disaster
  • Tesla to open first India store on 15 July in Mumbai 
  • Air India jet's fuel switches in focus, as crash preliminary report nears
  • Indian textile stocks surge as US slaps 35% tariff on Bangladesh exports

India eases sulphur emission rules for coal power plants, reversing decade-old mandate

Reuters in December reported the government was reviewing 2015 norms that required nearly 540 coal-based power units to install flue-gas desulphurisation (FGD) systems that remove sulphur from the plants' exhaust gases in phases starting in 2027

Reuters
13 July, 2025, 01:00 pm
Last modified: 13 July, 2025, 01:34 pm
Smoke billows from the cooling towers of a coal-fired power plant in Ahmedabad, India, October 13, 2021. Photo: REUTERS/Amit Dave/File Photo
Smoke billows from the cooling towers of a coal-fired power plant in Ahmedabad, India, October 13, 2021. Photo: REUTERS/Amit Dave/File Photo

India has reversed a decade-old mandate to install $30 billion worth of clean-air equipment, easing sulphur emission rules for most coal-fired power plants, a government order said.

Reuters in December reported the government was reviewing 2015 norms that required nearly 540 coal-based power units to install flue-gas desulphurisation (FGD) systems that remove sulphur from the plants' exhaust gases in phases starting in 2027.

The federal environment ministry late on Friday issued a gazette notification that exempted 79% of the coal-fired power plants, outside a 10-km (6 mile) radius of populated and polluted cities, from the 2015 mandate.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

The mandate to install FGD for another 11% of the plants near populated cities would be taken on a "case-to-case basis," the notification said.

The balance of 10% of the coal-fired power plants closer to New Delhi and other cities with a million-plus population will be required to install the desulphurisation equipment by December 2027, according to the new mandate.

The notification comes after state-run NTPC India's top electricity producer, spent about $4 billion on installing the equipment at about 11% of the power plants, and about 50% of the units either placed orders for the desulphurisation systems or are installing them.

The Friday notification did not mention the impact on the competitiveness or recovery of costs by these power plants.

It said the decision was taken after the Central Pollution Control Board carried out a detailed analysis of the increase in "carbon dioxide emission into the atmosphere due to operation of control measures being deployed."

Top News / World+Biz

India

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • TBS Sketch
    Framework agreement: What experts say about US 'security concerns' regarding Bangladesh
  • Representational image. Photo: Mohammad Minhaj Uddin/TBS
    Navy-run Dry Dock takeover boosts Ctg Port container handling, daily avg up 7%
  • BNP Secretary General Mirza Fakhrul Islam Alamgir speaks at a book unveiling event in Dhaka on 13 July 2025. Photo: Collected
    Fakhrul alleges conspiracy to eliminate Tarique from politics

MOST VIEWED

  • RAB Director General AKM Shahidur Rahman speaks at the press briefing on a fake bomb threat on Biman Bangladesh flight on Saturday, 12 July 2025. Photo: TBS
    Mother faked bomb threat on Biman flight to stop married son from flying with girlfriend: RAB
  • Bangladeshi garment workers make clothing in the sewing section of a factory in Gazipur, Bangladesh, April 9, 2025. Photo: REUTERS/Mohammad Ponir Hossain/File Photo
    Some Walmart garment orders from Bangladesh on hold due to US tariff threat
  • Infographic: TBS
    Dollar price plummets by Tk2.9 in a week as demand wanes
  • From Gulf to Southeast Asia, why Bangladeshis are facing visa denials
    From Gulf to Southeast Asia, why Bangladeshis are facing visa denials
  • Bangladesh and US hold tariff talks on 11 July 2025. Photo: CA Press Wing
    Dhaka, Washington yet to agree on 20% of US tariff conditions: BGMEA
  • Energy Adviser Fouzul Kabir Khan speaking about tariff negotiations with United States on 13 July 2025. Photo: TBS
    US wants a framework agreement with Bangladesh that includes their security concerns: Fouzul

Related News

  • Musk's Tesla marks formal India entry with Mumbai launch event
  • Inside the cockpit: How Air India's Boeing Dreamliner flight ended in disaster
  • Tesla to open first India store on 15 July in Mumbai 
  • Air India jet's fuel switches in focus, as crash preliminary report nears
  • Indian textile stocks surge as US slaps 35% tariff on Bangladesh exports

Features

Photo: Collected

Grooming gadgets: Where sleek tools meet effortless styles

7h | Brands
The 2020 Harrier's Porsche Cayenne coupe-like rear roofline, integrated LED lighting with the Modellista special bodykit all around, and a swanky front grille scream OEM Plus for the sophisticated enthusiast looking for a bigger family car that isn’t boring. PHOTO: Ahbaar Mohammad

2020 Toyota Harrier Hybrid: The Japanese Macan

1d | Wheels
The showroom was launched through a lavish event held there, and in attendance were DHS Motors’ Managing Director Nafees Khundker, CEO Imran Zaman Khan, and GMs Arman Rashid and Farhan Samad. PHOTO: Akif Hamid

GAC inaugurate flagship showroom in Dhaka

1d | Wheels
After India's visa restriction, China's Kunming is drawing Bangladeshi patients

After India's visa restriction, China's Kunming is drawing Bangladeshi patients

2d | Panorama

More Videos from TBS

When the Threat Is Inside the White House

When the Threat Is Inside the White House

1h | Others
Shooting in Pallabi: What the police are saying

Shooting in Pallabi: What the police are saying

3h | TBS Stories
News of The Day, 13 JULY 2025

News of The Day, 13 JULY 2025

5h | TBS News of the day
Countries where Bangladeshis are not getting positive responses to their visa applications

Countries where Bangladeshis are not getting positive responses to their visa applications

4h | TBS Stories
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net