Construction of Airport-Kamalapur section of metro rail progressing | The Business Standard
Skip to main content
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Monday
July 14, 2025

Sign In
Subscribe
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
MONDAY, JULY 14, 2025
Construction of Airport-Kamalapur section of metro rail progressing

Bangladesh

BSS
12 November, 2024, 03:00 pm
Last modified: 12 November, 2024, 03:05 pm

Related News

  • Metro rail to introduce easy ticketing system
  • DMTCL urges Metro passengers to wear masks amid rising Covid-19 cases
  • Metro rail resumes operation after Eid break; carrying meat not allowed
  • Metro rail takes Eid break today
  • Dhaka metro sees spike in passengers amid protest-choked city roads

Construction of Airport-Kamalapur section of metro rail progressing

According to the MRT Line-1 project details, the 19.872-km-long underground Airport Route will have 12 underground stations and the 11.369-km-long elevated Purbachal Route will have nine stations including underground ones

BSS
12 November, 2024, 03:00 pm
Last modified: 12 November, 2024, 03:05 pm
A general view of the metro rail. Photo: TBS
A general view of the metro rail. Photo: TBS

The construction of the first-ever underground metro rail on the Airport-Kamalapur route is underway with relocation of utility services aiming to be completed by 2028.

"Efforts underway to accomplish construction of the Mass Rapid Transit Line-1 (MRT Line-1) in time to reduce traffic congestion and improve environment-friendly commuter service in the capital," Managing Director of Dhaka Mass Transit Company Limited (DMTCL) Md Abdur Rouf told BSS here today.

He said the 31.241-km-long MRT Line-1 between the Hazrat Shahjalal International Airport and Kamalapur Railway Station will have two parts - the Airport Route and the Purbachal Route.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

The managing director said DMTCL authority, as the implementing agency of the project, has engaged various contractors for the construction of the MRT Line-1.

According to the MRT Line-1 project details, the 19.872-km-long underground Airport Route will have 12 underground stations and the 11.369-km-long elevated Purbachal Route will have nine stations including underground ones.

Among the nine stations of the Purbachal Route, seven will be elevated and two (Nodda and Natun Bazar) stations will be underground for coordination with the Airport-Kamalapur route.

The project details said the construction work of the line was inaugurated on 2 February 2023, while the feasibility study was conducted in 2016-2018.

Project Director Md Abul Kashem Bhuiyan said the entire MRT Line-1 project is being implemented in 12 packages at a cost of Tk53,977 crore while the Japan International Cooperation Agency (JICA) is providing Tk39,450 crore as project assistance and the Bangladesh government is giving Tk14,527 crore.

The project details said after completion, the metro rail will carry approximately 70,000 people from the airport to Kamalapur and vice versa every hour.

Experts said 13.66 lakh people can move by this metro rail per day which is about 2.83 times higher than that of the ongoing MRT Line-6 project.

The government is moving forward with the mega plan to build a 140-kilometer metro rail network in Dhaka and its adjacent areas by 2030 to reduce traffic congestion.

Once the planned network consisting of six lines comes into reality, 50 lakh people will be able to use the facilities as the lines will cover 129 kilometres area of the city - about 68km elevated and about 61km underground - having more than 100 stations.

Top News

Metro Station / Metro Rail

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • Infographic: TBS
    Govt to set six conditions to prevent delays, waste in foreign-funded projects
  • File Photo: Chief Adviser’s Deputy Press Secretary Abul Kalam Azad Majumder speaks at a press briefing at the Foreign Service Academy in Dhaka on 3 February 2025. File Photo: BSS
    No conclusive data supporting sharp rise in crime in Bangladesh: Govt
  • BNP Secretary General Mirza Fakhrul Islam Alamgir at a press conference held at the BNP Chairperson Khaleda Zia’s political office in Gulshan on 14 July 2025. Photo: Screengrab
    Well-orchestrated propaganda launched against BNP to prevent restoration of democratic politics: Fakhrul

MOST VIEWED

  • From Gulf to Southeast Asia, why Bangladeshis are facing visa denials
    From Gulf to Southeast Asia, why Bangladeshis are facing visa denials
  • Infographic: TBS
    Dollar price plummets by Tk2.9 in a week as demand wanes
  • Energy Adviser Fouzul Kabir Khan speaking about tariff negotiations with United States on 13 July 2025. Photo: TBS
    US wants a framework agreement with Bangladesh that includes their security concerns: Fouzul
  • CNG drivers blockaded a road in Banani demanding route allocation on 13 July 2025. Photo: TBS
    CNG drivers block road in Banani for hours, causing Mohakhali-Uttara gridlock 
  • BSEC directs 44 firms to transfer Tk1,000cr in unclaimed dividends to CMSF
    BSEC directs 44 firms to transfer Tk1,000cr in unclaimed dividends to CMSF
  • TBS Sketch
    Framework agreement: What experts say about US 'security concerns' regarding Bangladesh

Related News

  • Metro rail to introduce easy ticketing system
  • DMTCL urges Metro passengers to wear masks amid rising Covid-19 cases
  • Metro rail resumes operation after Eid break; carrying meat not allowed
  • Metro rail takes Eid break today
  • Dhaka metro sees spike in passengers amid protest-choked city roads

Features

DU students at TSC around 12:45am on 15 July 2024, protesting Sheikh Hasina’s insulting remark. Photo: TBS

‘Razakar’: The butterfly effect of a word

8m | Panorama
Photo: Collected

Grooming gadgets: Where sleek tools meet effortless styles

21h | Brands
The 2020 Harrier's Porsche Cayenne coupe-like rear roofline, integrated LED lighting with the Modellista special bodykit all around, and a swanky front grille scream OEM Plus for the sophisticated enthusiast looking for a bigger family car that isn’t boring. PHOTO: Ahbaar Mohammad

2020 Toyota Harrier Hybrid: The Japanese Macan

1d | Wheels
The showroom was launched through a lavish event held there, and in attendance were DHS Motors’ Managing Director Nafees Khundker, CEO Imran Zaman Khan, and GMs Arman Rashid and Farhan Samad. PHOTO: Akif Hamid

GAC inaugurate flagship showroom in Dhaka

1d | Wheels

More Videos from TBS

Cricketer Nasir Hossain and his wife Tamima claim their innocence in court

Cricketer Nasir Hossain and his wife Tamima claim their innocence in court

18m | TBS Stories
Iranian president narrowly escapes Israeli attack

Iranian president narrowly escapes Israeli attack

1h | TBS World
Why Modhumoti Bank’s NPL ratio stays below 2.5%

Why Modhumoti Bank’s NPL ratio stays below 2.5%

2h | TBS Programs
'Boat' to remain in symbol list, 'Shapla' not included: EC Machud

'Boat' to remain in symbol list, 'Shapla' not included: EC Machud

4h | TBS Today
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net