Outdated substations, cables prevent uninterrupted power: DPDC MD | The Business Standard
Skip to main content
  • Epaper
  • Economy
    • Aviation
    • Banking
    • Bazaar
    • Budget
    • Industry
    • NBR
    • RMG
    • Corporates
  • Stocks
  • Analysis
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Tuesday
May 13, 2025

Sign In
Subscribe
  • Epaper
  • Economy
    • Aviation
    • Banking
    • Bazaar
    • Budget
    • Industry
    • NBR
    • RMG
    • Corporates
  • Stocks
  • Analysis
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
TUESDAY, MAY 13, 2025
Outdated substations, cables prevent uninterrupted power: DPDC MD

Interviews

Eyamin Sajid
24 July, 2021, 11:00 pm
Last modified: 24 July, 2021, 11:05 pm

Related News

  • Adani fully restores power supply to Bangladesh as payments resume
  • Rights activists call for empowering women in power, energy sectors
  • Govt plans 15% cut in power consumption to tackle summer load
  • Finance ministry to get power to merge, dissolve loss-making state entities
  • Barapukuria Power Plant shuts down due to mechanical issues

Outdated substations, cables prevent uninterrupted power: DPDC MD

He says DPDC’s long-term plan includes undergrounding overhead cables to improve the quality of service

Eyamin Sajid
24 July, 2021, 11:00 pm
Last modified: 24 July, 2021, 11:05 pm

Dhaka Power Distribution Company (DPDC) is one of the six electricity distribution companies of the country that supplies electricity in a part of the capital and neighbouring Narayanganj.

In a recent interview with The Business Standard, its Managing Director Engineer Bikash Dewan talked about his experiences and challenges in supplying electricity to sensitive areas like the Secretariat and the High Court on one side and densely populated Old Dhaka on the other.

He opined that along with distributors, consumers can also play a vital role in getting uninterrupted electricity.

As a power distribution company, what is DPDC's main challenge in supplying electricity to Dhaka South City Corporation and Narayanganj?   

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

All the distribution companies face some uniform challenges in their distribution areas. But our challenges are different and tougher than others as we are the distributor in a critical area where the country's major administrative offices are situated.

There are two types of consumers in the DPDC's distribution areas – one is very sensitive consumers, and the other is risky users in Old Dhaka.

In our areas, we have the president's residence, the Supreme Court, the Secretariat, Dhaka Medical College and Hospital, the University of Dhaka, Bangabandhu Sheikh Mujib Medical University, etc. Ensuring an uninterrupted electricity supply to these VIP areas is a big challenge. 

The second challenge is supplying power to Old Dhaka due to unplanned, messy, and dense housing. People construct buildings, leaving no space from electric poles.

Residential buildings and electricity supply lines lay adjacent to each other. People may get electrocuted when they stretch their hands through windows. As a supplier, we always remain worried and cautious to keep the system safe out there.

The country has surplus capacity on the electricity generation side. Despite that, why do consumers in the capital still experience load shedding?

There is no relation between load shedding and generation capacity. Rather, this happens due to some outdated infrastructures in our distribution areas.

Outdated substations and distribution cables prevent us from delivering uninterrupted power to customers. Sometimes supply stops from transformers and due to circuit breakers' damage caused by an overload in the distribution system.

Besides, supply is often disrupted when our overhead cables sustain damage in other ways. For example, a rod falls from under-construction buildings, and due to banners and placards of different agencies.

How does DPDC respond to restore supply after disruptions and power outages?

We have dedicated manpower in 36 network operation and support service control rooms in our distribution areas. They work round the clock in three shifts.

If power supply to an area is disrupted due to the aforementioned reasons, our patrol team goes there and restores it as soon as they are informed.

Even in the lockdown, when most of the sectors were closed, our manpower was on standby to ensure an uninterrupted power supply to the city dwellers. DPDC has another group of manpower that also works round the clock to fix any cable damage in the distribution line.

Is there any long-term plan to prevent such incidents and provide quality electricity?

Yes, of course. We have mid-term and long-term plans along with short-term actions to improve the quality of service.

As part of our mid-term plan, we already conducted a detailed survey of Dhaka city. At the same time, under the long-term plan, we aim to underground overhead cables. A pilot programme will start soon in the capital's Dhanmondi with the Chinese government's funding.

Apart from these, we also emphasise monitoring and supervision. For that, we are upgrading to ICT-based supervision. We are also working on making a smart grid and already took a pilot project in Dhanmondi with French investment.

If we can implement these projects, electricity supply in Bangladesh will be the same as that in other developed countries.

As a power distributor, what type of behaviour do you expect from your consumers?

Consumers have a vital role to play in getting quality and uninterrupted electricity supply. We always request our consumers not to exceed the sanctioned load.

If they want to use more electricity than the sanctioned load, they should inform us so that we can improve the load capacity. Otherwise, transformers will fail due to overload. 

We also encourage them not to use illegal lines to avoid the tragedy that happened in Narayanganj. In addition, DPDC also suggests its consumers replace old cables at home or install quality electrical equipment when they build new houses.

Thank you for your time.

Thank you too.

Top News

substations / DPDC / power / Bikash Dewan

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • Employees of the now-dissolved NBR hold a protest programme in front of the revenue board's HQ on 13 May. Photo: Jahir Rayhan/TBS
    Dissolution of NBR: Employees announce three-day pen-down strike
  • File photo of a new NBR office in Agargaon, Dhaka. Photo: UNB
    Restructuring NBR essential to raise tax-GDP ratio, improve efficiency: CA Office
  • Photo: Collected.
    Bangladesh urges India to take measures to stop push-ins

MOST VIEWED

  • Food, fertilisers, raw materials: NBR plans advance tax on 200 duty-free imports
    Food, fertilisers, raw materials: NBR plans advance tax on 200 duty-free imports
  • A view of the state-owned Intercontinental Hotel in Dhaka, illuminated in the evening. The photo was taken on Sunday. Photo: Rajib Dhar/TBS
    InterContinental seeks Tk900cr govt-backed loan to recover from losses
  • Illustration: TBS
    Awami League, all its affiliates now officially banned
  • Infograph: TBS
    More woes for businesses as govt plans almost doubling minimum tax
  • Commuters resort to using rickshaws amid a lack of CNGs on 16 February 2025. Photo: TBS
    Is a rickshaw-free Dhaka really possible?
  • Photo: TBS
    Tea exports jump by 58% in 2024

Related News

  • Adani fully restores power supply to Bangladesh as payments resume
  • Rights activists call for empowering women in power, energy sectors
  • Govt plans 15% cut in power consumption to tackle summer load
  • Finance ministry to get power to merge, dissolve loss-making state entities
  • Barapukuria Power Plant shuts down due to mechanical issues

Features

Stryker was released three months ago, with an exclusive deal with Foodpanda. Photo: Courtesy

Steve Long’s journey from German YouTuber to Bangladeshi entrepreneur

21h | Panorama
Photo: Courtesy

No drill, no fuss: Srijani’s Smart Fit Lampshades for any space

2d | Brands
Photo: Collected

Bathroom glow-up: 5 easy ways to upgrade your washroom aesthetic

2d | Brands
The design language of the fourth generation Velfire is more mature than the rather angular, maximalist approach of the last generation. PHOTO: Arfin Kazi

2025 Toyota Vellfire: The Japanese land yacht

2d | Wheels

More Videos from TBS

There will be no problem if Awami League is not in the elections

There will be no problem if Awami League is not in the elections

42m | TBS Today
CPB does not want the 1972  constitution to be repealed

CPB does not want the 1972 constitution to be repealed

57m | TBS Today
Festive Mood at CU Ahead of 5th Convocation, Budget Nears Tk 140 Million

Festive Mood at CU Ahead of 5th Convocation, Budget Nears Tk 140 Million

2h | TBS Today
We prevented a nuclear war between India and Pakistan: Donald Trump

We prevented a nuclear war between India and Pakistan: Donald Trump

2h | TBS World
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net