Mongla Port inner bar dredging starts at a cost of Tk794 cr | The Business Standard
Skip to main content
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Monday
June 30, 2025

Sign In
Subscribe
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
MONDAY, JUNE 30, 2025
Mongla Port inner bar dredging starts at a cost of Tk794 cr

Infrastructure

Ali Akbar Tutul
13 March, 2021, 07:00 pm
Last modified: 13 March, 2021, 07:08 pm

Related News

  • Cargo vessel carrying fly ash sinks in Pashur River
  • Heavy-lift vessel docks for first time at Mongla Port
  • Health alert issued at Mongla Port to prevent Covid spread
  • 3 detained over reported robbery at commercial ship anchored at Mongla Port
  • Maritime ports advised to hoist local cautionary signal No 3

Mongla Port inner bar dredging starts at a cost of Tk794 cr

Once the project is completed, 9.5 metre draft container ships should be able to anchor at the port’s jetties

Ali Akbar Tutul
13 March, 2021, 07:00 pm
Last modified: 13 March, 2021, 07:08 pm
Mongla port is improving gradually due to the government's numerous measures and steps taken by the port authority. The number of both local and foreign commercial vessels to the port is on the rise. Photo: TBS
Mongla port is improving gradually due to the government's numerous measures and steps taken by the port authority. The number of both local and foreign commercial vessels to the port is on the rise. Photo: TBS

The government has started dredging the inner bar of Mongla Port – at a cost of Tk793.72 crore – to increase navigability and facilitate the anchoring of larger container vessels at the port's jetties. 

State Minister for Shipping Khalid Mahmud Chowdhury inaugurated the dredging project at Jaymonirgol, in Mongla, on Saturday.

Mongla Port Authority chairman Rear Admiral Mohammad Musa presided over the inaugural function.  Khulna city mayor Talukder Abdul Khaleq,   Deputy Minister of Environment, Forest and Climate Change Habibun Nahar MP and environment ministry secretary Mohammad Mezbah Uddin Chowdhury were the special guests.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

Khalid Mahmud Chowdhury said, "The turnaround time of the ships arriving at the port will be reduced; the cost of transporting the goods will be saved once the dredging is completed in the inner bar."

"The number of ships at Mongla Port will increase significantly, which will play a vital role in the country's economy, including the development of the country's southwestern part," he added.

The port will play a major role in trade and commerce, which will help implement the incumbent government's plan to build a developed country by 2041, the state minister said.

He said under the Indian loan, a project worth around Tk6,000 crore has been undertaken for the expansion of Mongla Port.

Earlier, dredging was done at the outer bar of Mongla port at a cost of around Tk700 crore. Ships with a draft of 9.5 metres have already started arriving. As a result, the number of ships sailing at the port and its revenue are both increasing.

The dredging of the 19-kilometre inner bar from Joymanirgol of Pashur Channel to Jetty of the port will solve the navigability crisis of the port. During this time 216.09 lakh cubic metres of sand will be dredged.

As a result, ships with 9.50 metre draft to 10 metre draft should be able to anchor at the Mongla Port jetty directly. At present, only ships with a seven metre draft can approach the port's jetties.

Once the project is completed, which is expected by 2022, container ships of 9.5 metre draft will be able to anchor at the jetties of the port and this port will become an alternative to Chattogram Port. 

Jianshu Haihong Construction Engineering Company Limited (JHCEC) and China Civil Engineering Construction Corporation (CHINA CIVEC) will do the dredging work jointly.

Bagerhat Deputy Commissioner ANM Faizul Haque, Mongla Port Authority member (Harbor and Marine) Captain M Abdul Wadud Tarafdar, member (Engineering and Development) Md Imtiaz Hossain, director (Administration) Md Gias Uddin, the Inner Bar Dredging Project's Project Director Sheikh Shawkat Ali, divisional chiefs, officials and employees of various departments of the Mongla Port Authority,  eminent personalities, and media persons were also present at the project's inauguration.

Bangladesh / Top News

Mongla port

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • File photo of Chattogram Port/TBS
    Ctg port to dispatch 7,000 containers today after two-day NBR 'complete shutdown'
  • A Chevron gas station sign is seen in Del Mar, California, April 25, 2013. Chevron will report earnings on April 26. REUTERS/Mike Blake
    Chevron to resume Jalalabad gas project after Petrobangla clears $237m dues
  • US Secretary of Commerce Howard Lutnick holds a chart as US President Donald Trump delivers remarks on tariffs in the Rose Garden at the White House in Washington, DC, US, April 2, 2025. REUTERS/Carlos Barria
    Trump says he's not planning to extend a pause on global tariffs beyond 9 July

MOST VIEWED

  • Representational image. File Photo: Rajib Dhar/TBS
    Gold prices drop by Tk4,292 within a week
  • Return to work or face stern action, govt warns protesters as NBR jobs declared 'essential services'
    Return to work or face stern action, govt warns protesters as NBR jobs declared 'essential services'
  • Representational image/Collected
    5 arrested over Cumilla's Muradnagar rape, circulation of video 
  • Officials of the NBR, under the banner of the NBR Unity Council, continued their protest on Sunday since 9am. Photo: Syed Zakir Hossain/TBS
    NBR staff call off protest as govt goes tough
  • Remittance inflow hits record $30b in FY25
    Remittance inflow hits record $30b in FY25
  • Record $30b remittance lifts reserves to $26b
    Record $30b remittance lifts reserves to $26b

Related News

  • Cargo vessel carrying fly ash sinks in Pashur River
  • Heavy-lift vessel docks for first time at Mongla Port
  • Health alert issued at Mongla Port to prevent Covid spread
  • 3 detained over reported robbery at commercial ship anchored at Mongla Port
  • Maritime ports advised to hoist local cautionary signal No 3

Features

Photo: Collected

Innovative storage accessories you’ll love

22h | Brands
Two competitors in this segment — one a flashy newcomer, the other a hybrid veteran — are going head-to-head: the GAC GS3 Emzoom and the Toyota CH-R. PHOTOS: Nafirul Haq (GAC Emzoom) and Akif Hamid (Toyota CH-R)

GAC Emzoom vs Toyota CH-R: The battle of tech vs trust

22h | Wheels
Women farmers, deeply reliant on access to natural resources for both farming and domestic survival, are among the most affected, caught between ecological collapse and inadequate structural support. Photo: Shaharin Amin Shupty

Hope in the hills: How women farmers in Bandarban are weathering the climate crisis

15h | Panorama
How a young man's commitment to nature in Tetulia won him a national award

How a young man's commitment to nature in Tetulia won him a national award

1d | Panorama

More Videos from TBS

Two firefighters killed in Idaho shooting

Two firefighters killed in Idaho shooting

1h | TBS World
'An advisor is abusing power in Muradnagar for his own interests'

'An advisor is abusing power in Muradnagar for his own interests'

13h | TBS Stories
NBR officials announce withdrawal of protest at joint press conference

NBR officials announce withdrawal of protest at joint press conference

14h | TBS Today
Trump is not making any concessions to India: The Economist

Trump is not making any concessions to India: The Economist

4h | Others
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net