Rooppur NPP: Hydro-accumulators’ testing begins in Russia | The Business Standard
Skip to main content
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Saturday
June 07, 2025

Sign In
Subscribe
  • Latest
  • Economy
    • Banking
    • Stocks
    • Industry
    • Analysis
    • Bazaar
    • RMG
    • Corporates
    • Aviation
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
SATURDAY, JUNE 07, 2025
Rooppur NPP: Hydro-accumulators’ testing begins in Russia

Energy

UNB
16 July, 2022, 05:15 pm
Last modified: 16 July, 2022, 05:22 pm

Related News

  • Russia extends Rooppur loan repayment by two years, waives $164m penalty
  • Rosatom State Corporation refutes provocative statements about implementation of Rooppur NPP project
  • Bangladesh Atomic Energy Commission gets licence to import nuclear fuel for Rooppur NPP
  • Russian ship with Rooppur Power Plant machinery docks at Mongla
  • More machinery for Rooppur power plant arrive at Mongla port

Rooppur NPP: Hydro-accumulators’ testing begins in Russia

According to Rosatom, the Russian contractor of the Rooppur NPP, hydraulic test is one of the most important final inspections of the equipment

UNB
16 July, 2022, 05:15 pm
Last modified: 16 July, 2022, 05:22 pm
Photo: UNB
Photo: UNB

Hydraulic testing of half bodies of Passive Core Flooding System (PCFS) Hydro-accumulators begins at Petrozavodsk Branch of AEM-Technologies, Russia.

These are intended for Power Unit - 2 of Rooppur Nuclear Power Plant. Eight PCFS Hydro-accumulators will be installed in each unit.

According to Rosatom, the Russian contractor of the Rooppur NPP, hydraulic test is one of the most important final inspections of the equipment.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

PCFS Hydro-accumulator is filled with specially treated thermally enriched water and the pressure in the vessel is raised up to 4.4 MPa and held for 10 min minimum.

After the pressure is released, the outer surface is inspected visually for any leaks and permanent deformations.

Hydro-accumulators each having a capacity of 120 cubic meters are manufactured from stainless steel.

It comprises three shells and two heads. Ladders and maintenance platforms as well as other internals are installed within the body.

PCFS refers to the second level of NPP passive safety systems. It is intended for the removal of the coolant residual heat of the reactor primary circuit.

An aqueous boric acid solution heated to a temperature of approximately 60 degrees is stored in the Hydro-accumulator during operations of the plant.

If for any reason the pressure in the primary circuit falls below a certain level, the fluid is automatically fed into the reactor and the active core is cooled down.

Rooppur NPP is designed and being constructed by the Engineering Division of the Rosatom State Corporation.

AEM-Technologies has been producing main reactor room equipment for both the units of the power plant.

According to Bangladesh Atomic Energy Commission, the implementing authority of the RNPP, the first unit of the power plant was scheduled to start operation in 2022 and second one in 2024.

But recently the first unit's operation was rescheduled to 2024 and second unit to 2025. 
 

Top News

Rooppur NPP

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • BNP Standing Committee criticises chief adviser's speech, calls for national election by December
    BNP Standing Committee criticises chief adviser's speech, calls for national election by December
  • Children celebrate Eid-ul-Adha at Baitul Mukarram on 7 June 2025. Photo: Rajib Dhar/TBS
    Main Eid congregation held at National Eidgah
  • Tesla CEO Elon Musk greets US President Donald Trump in Philadelphia, Pennsylvania, US, March 22, 2025. Photo: REUTERS/Nathan Howard/File Photo
    Russia responds to Trump-Musk feud with jokes, jibes and job offers

MOST VIEWED

  • BRAC Bank to issue Tk1,000cr social bond
    BRAC Bank to issue Tk1,000cr social bond
  • Long lines of vehicles were seen at the Mawa toll plaza, although movement remained smooth on 5 June 2025. Photos: TBS
    Padma Bridge sets new records for daily toll collection, vehicle crossings
  • The government vehicle into which a sacrificial cow was transported by a UNO. Photo: TBS
    Photo of Natore UNO putting cattle in govt vehicle takes social media by storm
  • Fire service personnel carry out rescue operations after Dhaka-bound Parjatak Express train hit a CNG auto-rickshaw last night (5 June). Several other vehicles also got trapped under the train. Photo: Mohammad Minhaj Uddin
    3 killed, several injured after Dhaka-bound Parjatak Express train hits CNG auto-rickshaw on Kalurghat bridge
  • China to help Bangladesh counter political disinformation in foreign media
    China to help Bangladesh counter political disinformation in foreign media
  • CA’s televised address to the nation on the eve of the Eid-ul-Adha on 6 June. Photo: Focus Bangla
    National election to be held any day in first half of April 2026: CA

Related News

  • Russia extends Rooppur loan repayment by two years, waives $164m penalty
  • Rosatom State Corporation refutes provocative statements about implementation of Rooppur NPP project
  • Bangladesh Atomic Energy Commission gets licence to import nuclear fuel for Rooppur NPP
  • Russian ship with Rooppur Power Plant machinery docks at Mongla
  • More machinery for Rooppur power plant arrive at Mongla port

Features

Illustration: TBS

Unbearable weight of the white coat: The mental health crisis in our medical colleges

2d | Panorama
(From left) Sadia Haque, Sylvana Quader Sinha and Tasfia Tasbin. Sketch: TBS

Meet the women driving Bangladesh’s startup revolution

3d | Panorama
Illustration: TBS

The GOAT of all goats!

4d | Magazine
Photo: Nayem Ali

Eid-ul-Adha cattle markets

4d | Magazine

More Videos from TBS

Why is there a rift between Donald Trump and Elon Musk?

Why is there a rift between Donald Trump and Elon Musk?

16h | TBS World
Trump bans citizens of 12 countries, including Iran, from entering the United States

Trump bans citizens of 12 countries, including Iran, from entering the United States

17h | TBS World
Blacksmiths Hoping for Profit During Eid

Blacksmiths Hoping for Profit During Eid

22h | TBS Stories
Home Affairs Advisor explains security arrangements for empty Dhaka

Home Affairs Advisor explains security arrangements for empty Dhaka

22h | TBS Today
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net