Power flow established at Rampal power plant sub station from Payra plant | The Business Standard
Skip to main content
  • Epaper
  • Economy
    • Aviation
    • Banking
    • Bazaar
    • Budget
    • Industry
    • NBR
    • RMG
    • Corporates
  • Stocks
  • Analysis
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
The Business Standard

Sunday
May 25, 2025

Sign In
Subscribe
  • Epaper
  • Economy
    • Aviation
    • Banking
    • Bazaar
    • Budget
    • Industry
    • NBR
    • RMG
    • Corporates
  • Stocks
  • Analysis
  • Videos
    • TBS Today
    • TBS Stories
    • TBS World
    • News of the day
    • TBS Programs
    • Podcast
    • Editor's Pick
  • World+Biz
  • Features
    • Panorama
    • The Big Picture
    • Pursuit
    • Habitat
    • Thoughts
    • Splash
    • Mode
    • Tech
    • Explorer
    • Brands
    • In Focus
    • Book Review
    • Earth
    • Food
    • Luxury
    • Wheels
  • Subscribe
    • Epaper
    • GOVT. Ad
  • More
    • Sports
    • TBS Graduates
    • Bangladesh
    • Supplement
    • Infograph
    • Archive
    • Gallery
    • Long Read
    • Interviews
    • Offbeat
    • Magazine
    • Climate Change
    • Health
    • Cartoons
  • বাংলা
SUNDAY, MAY 25, 2025
Power flow established at Rampal power plant sub station from Payra plant

Energy

TBS Report
07 April, 2022, 08:30 pm
Last modified: 07 April, 2022, 09:00 pm

Related News

  • Power supply to remain normal in summer: PDB chairman
  • Power supply situation improves as Adani plant units resume operations
  • Adani to restore full power to Bangladesh in days but differences remain, sources say
  • Bangladesh seeks full power supply restoration from Adani plant
  • Govt ensures uninterrupted power supply across country: Adviser Fouzul

Power flow established at Rampal power plant sub station from Payra plant

400kV Switchyard and Interconnecting Transformer was energised on 6 April

TBS Report
07 April, 2022, 08:30 pm
Last modified: 07 April, 2022, 09:00 pm
Power flow established at Rampal power plant sub station from Payra plant

Power flow has been established from the Payra Power Plant to the 400 kV GIS Switchyard and Interconnecting Transformer of the Maitree Plant Sub-Station.

The 400kV switchyard and interconnecting transformer was energised in a ceremony held on Wednesday (6 April) at the Rampal power plant, also known as Maitree Super Thermal Power Project, said a press release.

Present on the occasion were Sayeed Akram Ullah, managing director, BIFPCL, DK Dubey, chief general manager, BK Gangopadhyay, BHEL International Operations head, and Uday Shankar, BHEL Project head.

The Business Standard Google News Keep updated, follow The Business Standard's Google news channel

The 1,320 MW Maitree Super Thermal Power Project, through its 400 kV GIS Switchyard and Interconnecting Transformer, is providing wheeling facility of the 400 kV power from the Payra Power Project to the 230 kV grid system of Bangladesh to enable the Power Grid Corporation of Bangladesh to transmit additional power towards Khulna region to address peak summer demand.

The 400 kV GIS Switchyard and Interconnecting Transformer at the Maitree Plant Sub-Station was energized on 6 April, and the power flow will be gradually established as per requirement.

The Maitree Super Thermal Power Project is being set up by Bharat Heavy Electricals Limited (BHEL) through Bangladesh-India Friendship Power Company Private Ltd. (BIFPCL), which is a 50:50 Joint Venture Company between India's NTPC and Ltd and Bangladesh Power Development Board (BPDB).

The Power Plant is being set up with Ultra Super Critical Technology to actively mitigate environmental impacts, at the same time introducing coal power generation in a country with limited alternative fuel options.

Some of the in-built measures to minimise air and water pollution, inter-alia includes a Flue Gas Desulphurization System (FGD) without any bypass to control the emission of SOx, Integrated Effluent and Waste Management System to avoid contamination of Prasur River, use of High Grade imported coal with low Ash and Sulphur content, construction of the tallest Chimney (275 m) for wider dispersion of flue gas emissions, among others.

The Maitree project is under advance stage of implementation and will start power generation soon, according to the media release

Rampal Power Station / power supply / Payra 1320 MW Thermal Power Plant

Comments

While most comments will be posted if they are on-topic and not abusive, moderation decisions are subjective. Published comments are readers’ own views and The Business Standard does not endorse any of the readers’ comments.

Top Stories

  • A BNP delegation led by senior leader Khandaker Mosharraf Hossain meets with Chief Adviser Muhammad Yunus during a meeting at Guest State House Jamuna on 24 May 2025. Photo: CA Press Wing
    Stalemate over election: Resolving or deepening?
  • Showkat Aziz Russell, president of the Bangladesh Textiles Mills Association (BTMA). Photo: Collected
    Gas crisis in industries: Businessmen 'being killed like intellectuals were killed in 1971', says BTMA President Showkat
  • China's commerce minister to visit Bangladesh with largest-ever business delegation
    China's commerce minister to visit Bangladesh with largest-ever business delegation

MOST VIEWED

  • Infographic: TBS
    New transport strategy for Dhaka seeks to promote walking, cycling
  • Representational image: Collected
    Minimum tax may rise to Tk5,000 for individuals, Tk1,000 for new filers
  • File photo of Sajib Barai. Photo: TBS
    Barishal medical student ends life after citing 'excessive academic pressure'
  • FIre service officials taking the bodies after a truck hitting a motorcycle in Banani left two people killed on the spot on 25 May 2025. Photo: TBS
    2 killed after truck hits motorcycle in Banani
  • Ports crippled as NBR officials escalate protests, threaten full trade halt
    Ports crippled as NBR officials escalate protests, threaten full trade halt
  • BNP senior leaders and CA at Jamuna on 24 May evening. Photo: CA Press Wing
    Talks with CA: BNP calls for swift completion of reforms for elections in Dec, removal of 'controversial' advisers

Related News

  • Power supply to remain normal in summer: PDB chairman
  • Power supply situation improves as Adani plant units resume operations
  • Adani to restore full power to Bangladesh in days but differences remain, sources say
  • Bangladesh seeks full power supply restoration from Adani plant
  • Govt ensures uninterrupted power supply across country: Adviser Fouzul

Features

The Hili Land Port, officially opened in 1997 but with trade roots stretching back to before Partition, has grown into a cornerstone of bilateral commerce.

Dhaka-Delhi tensions ripple across Hili’s markets and livelihoods

1h | Panorama
Photo: Collected

Desk goals: Affordable ways to elevate your study setup

7h | Brands
Built on a diamond-type frame, the Hornet 2.0 is agile but grounded. PHOTO: Asif Chowdhury

Honda Hornet 2.0: Same spirit, upgraded sting

7h | Wheels
The well has a circular opening, approximately ten feet wide. It is inside the house once known as Shakti Oushadhaloy. Photo: Saleh Shafique

The last well in Narinda: A water source older and purer than Wasa

2d | Panorama

More Videos from TBS

All Israeli armored brigades are now deployed in Gaza

All Israeli armored brigades are now deployed in Gaza

25m | TBS World
India-Pakistan, China-Iran; Why is everyone pulling the Taliban closer?

India-Pakistan, China-Iran; Why is everyone pulling the Taliban closer?

1h | Others
News of The Day, 25 MAY 2025

News of The Day, 25 MAY 2025

2h | TBS News of the day
Can Trump ban international student admissions to Harvard?

Can Trump ban international student admissions to Harvard?

3h | Others
EMAIL US
contact@tbsnews.net
FOLLOW US
WHATSAPP
+880 1847416158
The Business Standard
  • About Us
  • Contact us
  • Sitemap
  • Advertisement
  • Privacy Policy
  • Comment Policy
Copyright © 2025
The Business Standard All rights reserved
Technical Partner: RSI Lab

Contact Us

The Business Standard

Main Office -4/A, Eskaton Garden, Dhaka- 1000

Phone: +8801847 416158 - 59

Send Opinion articles to - oped.tbs@gmail.com

For advertisement- sales@tbsnews.net